Develop a new machine and open a new game. Recently, China Automatic Control System Engineering Co., Ltd. and Prime Road Company of Thailand formally signed the Cambodian Kampong Ching Yang 60MW photovoltaic power generation EPC contract. This is another important project obtained by the company in the Cambodian market.
The project is about 60 kilometers northwest of Phnom Penh, the capital of Cambodia, and uses high-efficiency monocrystalline silicon double-glass double-sided photovoltaic modules, string inverters and tracking bracket systems to maximize power generation. After the completion of the project, the power supply in the Kampong Chingyang area will be greatly increased, providing about 150,000 MW·h of power generation annually, providing power guarantee for the surrounding economic development, production and life, and achieving energy conservation and emission reduction, and protecting the local ecological environment.
Keywords: One Belt One Road, overseas projects, engineering news
The signing and entry into force of the project further consolidated China Autocontrol’s dominant position in the Cambodian hydropower project contracting market, played a positive role in promoting the promotion and construction of Chinese brands in Cambodia, and at the same time provided strong support for the company’s sustainable development. In the next step, China Automatic Control System Engineering Co., Ltd. will rely on the One Belt One Road initiative, while doing a good job in epidemic prevention and control, it will organize personnel and equipment to carry out construction in strict accordance with the requirements of the owner, grasp the golden period of construction, and complete the construction tasks with quality and quantity. Editor/Tian Zengpeng
Comment
Write something~