Macro
Xinjiang’s 14th Five-Year Plan for Infrastructure Construction
Seetao 2021-09-06 10:16
  • Infrastructure construction in the future will be a strong support for the in-depth advancement of the Belt and Road Initiative
Reading this article requires
23 Minute

In 2020, China will complete the construction of a moderately prosperous society in an all-round way. Xinjiang has entered a new stage of development. Xinjiang’s strategic arrangement for the long-term goal of 2035 has set forth the long-term goal of basically realizing socialist modernization. Unswervingly implement the strategy of expanding domestic demand, deepen the supply-side structural reforms, make good use of the large domestic market, focus on expanding investment, promoting consumption, promoting opening to the west, actively integrating into the domestic and international dual cycle, and providing impetus for high-quality economic development.

Persist in the use of reform methods and market-oriented operation methods, coordinate the construction of traditional and new infrastructure, give full play to the leveraging role of government investment, stimulate the vitality of private investment, implement a number of major projects in key areas such as transportation, water conservancy, energy, and communications, and consolidate the economy The foundation of social development.

Railway key projects

1. Continued construction projects: Hetian-Ruoqiang Railway, Aksu-Alar Railway.

2. Newly started projects: Yining-Akesu Railway, Jiangjunmiao-Naomao Lake Railway, Lop Nur-Ruoqiang Railway, Fuyun-Takshkent Port Railway.

3. Capacity expansion and renovation projects: Urumqi-Jiangjunmiao Railway's second line of electrification expansion and renovation, Sanping-Toutun River connection line, Jinghe-Alashankou railway expansion of the second line, Korla-Akesu-Kashgar expansion and renovation, Jingyi The second line and the Lanxin Passenger Dedicated Line were added to Huoshan Railway to reach speed.

4. Accelerate the advancement of preliminary work projects: Yining-Baluntai Railway, Karamay-Jundong Railway, Tacheng-Alashankou Railway, Santang Lake-Laoye Temple Railway, Bachu-Shache Railway, Alar-Tumushu Ke-Bachu Railway. Planning research Urumqi-Kashgar high-speed railway, Urumqi-Khorgos high-speed railway, Hotan-Xigaze railway, Tacheng-Ayaguzi railway, Karamay-Altai railway electrification transformation, Karamay-Tacheng railway electrification transformation, Southern Xinjiang railway Kashgar —Electrification transformation of Hetian section.

Civil aviation: implement the action of building a powerful country in civil aviation in the new era, and make up for the shortcomings of infrastructure, airspace, talent and technology. Speed up the construction of the Urumqi international aviation hub, build, renovate and expand a number of branch airports, and advance the preliminary work of some airports' second runways. Vigorously develop general aviation, build a batch of general airports, and encourage branch airports to increase general aviation facilities. Optimize and improve the route network, actively open up international routes, and encrypt domestic routes in Xinjiang, forming a pattern of "East and West into a fan and Xinjiang into a network". Promote the construction of international airports and international air cargo transportation centers from east to west. By 2025, there will be 37 civil transportation airports built and under construction in the district, of which: 15 civil transportation airports have been built and under construction in five years.

Key Civil Aviation Projects

1. Continued construction projects: Urumqi Airport Reconstruction and Expansion, Kashgar Airport Reconstruction and Expansion, Turpan Airport Reconstruction and Expansion, Zhaosu Airport, Taxkorgan Airport.

2. New construction projects: 9 new airports including Alar, Zhundong (Qitai), Bayinbulak, Barkol, Wusu, Luntai, Hebuxair, Pishan, Qiemo (38 regiment), etc. Karamay, Nalati, Bole, Kuqa, Hami, Shihezi, Tumushuke, Shache and other 8 airport renovation and expansion projects.

3. Additions included in the "National Civil Transport Airport Layout Plan" and the "14th Five-Year Plan" construction plan and started construction projects: Aheqi, Jimunai, Qinghe, Baicheng and other 4 new airports.

4. General Airport: Horgos, Wuerhe, Hot Springs, Yecheng, Celle, Burqin, Bo Lake, Turks, Fuhai, Gongliu, Nilek, Wensu (Grand Canyon), Hemu General airports such as scenic spot, Sailimu Lake scenic spot, Bachu, 10 regiment (Alar city), 224 regiment (Kunyu city), Beitun and other general airports.

Highway key projects

Accelerate the implementation of the national expressway network, orderly promote the construction of provincial expressways and high-speed (first-class) connecting lines, and build an interconnected, extensive, smooth and efficient expressway network. Promote the upgrading and transformation of low-level sections of ordinary national and provincial roads such as G216 and G217, strengthen the transformation of urban transit sections such as National Road G312 and National Road G314, and promote the coverage of qualified key towns and towns with third-level and above roads and qualified 5A-level tourist attractions High-speed (first-class) highway coverage, realizing the whole Xinjiang trunk highway into a ring and network. By 2025, the high-speed (first-class) roads will be basically “connected to counties and counties”, and the mileage of the high-speed (first-class) roads will reach more than 10,000 kilometers.

1. Highway projects. Construct Itunbulak-Ruoqiang, Ruoqiang-Minfeng, Yuli-35 Regiment, 35th Regiment-Ruoqiang, G0711 line Urumqi-Yuli, G7 line Yiwu-Barkol, Balikun-Mulei, G3018 line Jinghe -Alashankou, Urumqi Ring Expressway (West Line), S519 line Wutong Daquan-Shaquanzi, S21 line Aletai-Urumqi, Dushanzi-Kuqa and other highway projects.

2. Ordinary national and provincial highway projects. Construction of G218 line Nalati-Balentai, G575 line Barkol-Hami, G314 line Burunkou-Hongqi Lafu port, G216 line Beitun-Fuyun, G575 line Laoyemiao port-Barkol, G578 line Longkou -Zaotian, G577 line Turks-Zhaosu, S254 line Yuli-Qiemo, S232 line Burqin-Kanas airport, S327 line Beishan coal mine-Jiangjunmiao-Wucaiwan, G217 line Altay-Burqin, G218 line Iraq Ning City Transit Section, G577 Line Jinghe-Yining, G579 Line Kuqa-Baicheng-Yuergun, G580 Line Aksu-Awati, G335 Line Tower Crossing-Tuoli-Baktu Port, G312 Line Hutubi -Manas, G314 line Aksu transit section, G216 line Hongshanzui port-Altay and other national provincial highway projects.

Major water conservancy infrastructure construction projects

Build a modern water conservancy support system. Focusing on the construction of water conservancy projects and supporting facilities, speed up the construction of a number of major water resources allocation projects, backbone control water conservancy projects, and large and medium-sized irrigation districts to continue the construction and modernization projects, and focus on promoting the implementation of a number of major rivers such as Aksu River and Kushan River Controlling water conservancy hubs and major water resources allocation projects shall build an engineering network system based on water storage, water saving as the key, and water transfer as a supplement.

1. Large and medium-sized reservoirs. The construction of the Dashixia Water Conservancy Project and the Momog Water Conservancy Project will be completed, the construction of the Yulong Kashi Water Control Project and the Kurgan Water Control Project will be accelerated, and the construction of key projects such as the Cele River Kunlun Water Control Project will be started.

2. Continued construction and modernization projects for large and medium-sized irrigation districts. Carry out the continuous construction of large-scale irrigation districts such as Kashgar, focus on upgrading the key irrigation and drainage facilities, and improve the water metering facilities of large-scale irrigation districts; build a batch of medium-sized irrigation districts to continue supporting and water-saving renovation projects to improve the irrigation area of 5.5 million mu.

3. Rural water supply guarantee project. Build a batch of backbone water sources, key water supply projects and backup water sources, and promote the large-scale development of various village water supply projects in an orderly manner.

4. Key inland river treatment projects. Continue to promote a number of key river flood control projects such as Kashgar River, Hotan River, Aksu River, Kaidu River, Weigan River, and Tarim River.

5. Large and medium-sized dangerous reservoirs (gates) to remove dangers and strengthen projects. The eight large and medium-sized dams identified as "three types of dams" were strengthened and a batch of large and medium-sized sluices were strengthened.

750 kV power transmission and transformation project

Build a power support system. Accelerate the "Xinjiang Power Transmission" project, implement the Hami-Chongqing ±800 kV UHV DC transmission project, and advance the preliminary work of the fourth channel of "Xinjiang Power Transmission", and strive to reach the output of Xinjiang by the end of the 14th Five-Year Plan 180 billion kilowatt hours. Improve the voltage grid of all levels, promote the further extension of the 750 kV power grid to southern Xinjiang, and build the 750 kV power grid around Tarim. Promote the "Electrified Xinjiang" work according to local conditions, speed up the replacement of electric energy in residential, industrial and commercial, construction, transportation and other fields, and increase the proportion of electric energy in the final energy consumption.

1. Northern Xinjiang region. Focus on the construction of Yili-Bozhou-Wusu-Phoenix II 750 kV transmission and transformation project, Tacheng-Wusu 750 kV transmission and transformation project, Shihezi 750 kV transmission and transformation project, Yili-Kuqa II 750 kV transmission and transformation project Electrical engineering.

Keywords: infrastructure construction, infrastructure construction, infrastructure engineering news

2. Southern Xinjiang region. Focus on the construction of Shache-Hetian II 750kV transmission and transformation project, Kashgar and Hotan substation expansion project, Bazhou-Tieganlik, Tieganlik-Ruoqiang, Ruoqiang-Huatugou double-circuit 750kV transmission and transformation project Power engineering, Kuqa-Alar-Bachu 750kV power transmission and transformation project, Hotan-Minfeng, Minfeng-Qiemo, Qiemo-Ruoqiang, Ruoqiang-Korla 750kv power transmission and transformation project. Editor/Xu Shengpeng


Comment

Related articles

Macro

195.3 billion yuan! Indonesia and Saudi Arabia sign strategic cooperation agreement

07-04

Macro

EU's demand for battery energy storage to surge tenfold by 2030

07-04

Macro

Zoomlion and China Railway 25th Bureau reached a strategic cooperation

07-04

Macro

China oil and Kazakhstan sign energy cooperation agreements

07-02

Macro

100 billion! The cooperation project between and China Coal Group is ready to start

07-01

Macro

Decoding the dark horse Hefei: the counterattack code of a central city

06-30

Collect
Comment
Share

Retrieve password

Get verification code
Sure