seetao.com learned from China Railway Nanchang Bureau Group Co., Ltd. that on September 8, 2021, the Jiangxi section of the Jiangxi Ganzhou-Guangdong-Shenzhen high-speed rail entered the joint debugging and joint test phase, which marked that the railway was one step closer to its opening and operation.
The Ganzhou-Shenzhen high-speed railway starts from Ganzhou, Jiangxi in the north, passes through cities such as Heyuan, Huizhou and Dongguan in Guangdong, and ends in Shenzhen in the south. The main line has a total length of 436.37 kilometers and a design speed of 350 kilometers per hour. The 14 stations including Heyuan East and Shenzhen North are an important part of China’s mid- and long-term railway network planning for the North-South Great Passage Beijing-Hong Kong High-speed Railway. Possesses the conditions for opening and operation.
The railway department said that after the completion of the Jiangxi Ganzhou-Guangdong-Shenzhen high-speed rail high-speed rail, the train travel time will be shortened from the current nearly 7 hours to about 2 hours, and the fastest travel time of Nanchang via Ganzhou to Shenzhen will be shortened from the current 9.5 hours to the current 9.5 hours. About 3.5 hours. At the same time, the Jiangxi-Shenzhen high-speed railway is of great significance for improving the regional road network layout, accelerating Jiangxi's integration into the Guangdong-Hong Kong-Macao Greater Bay Area, promoting the "dual-zone linkage" of "Bay Area + Old District", and driving economic and social development along the line. Editor/Tian Zengpeng
Comment
Write something~