Investment
Power China won the bid for the Belarusian water supply project
Seetao 2021-09-10 15:06
  • The main construction includes deep-water well drilling, construction of above-ground facilities and related ancillary works
Reading this article requires
5 Minute

On September 6, 2021, the China Power Construction Hydropower Ninth Bureau won the bid for the upgrade and transformation of the Chervin water supply system, the construction of water storage facilities and the iron removal station in Belarus. This is after the company won the bid to build the Grodno local fuel and natural gas mixed boiler house construction project, the Barobuha sewage system upgrade and transformation project, and the Soligoorsk sewage treatment plant upgrade and transformation (Phase I) project. Another project that won the bid has effectively implemented the concept of "promoting the market on the spot".

The project is located in Chervin City, Minsk Region, with a construction period of 28.5 months. The main construction content includes three parts: deep-water well drilling, deep-water well above-ground facilities construction and modular iron removal station installation. After the completion of the project, it will further improve the water supply system and related facilities in Cherven, which is of great significance to improving the quality of life of local people and promoting local development.

Keywords: One Belt One Road, overseas projects, engineering news

Power China Hydropower Ninth Bureau has a good reputation in the Belarusian hydropower market, adapts to the new changes and requirements of the internal and external markets, further deepens and promotes the adaptive reform and innovation of the marketing system and mechanism, and adopts regional marketing and joint marketing to deepen the market and actively Cultivate localized contract performance capabilities throughout the life cycle, and continuously improve international project marketing capabilities and international brand influence. In the next step, China Power Construction Hydropower Ninth Bureau will rely on the Belt and Road Initiative to do a good job in epidemic prevention and control, organize personnel and equipment to carry out construction in strict accordance with the requirements of the owner, grasp the golden period of construction, and complete the construction tasks with quality and quantity. . Editor/Tian Zengpeng

Comment

Related articles

Investment

CITIC Environment actively promotes ecological and environmental protection

04-26

Investment

Aerospace Design Group won multiple foreign aid projects

04-25

Investment

Tongwei Group Joins Hands with ACO for the First Cooperation Project to Land

04-25

Investment

Shaanxi Traffic Control Group and Maimo Company Sign Cooperation Agreement

04-23

Investment

German Lindau Municipal Sewage Treatment Plant Expansion Project

04-22

Investment

Follow up maintenance project for the Maldives China Malaysia Friendship Bridge

04-19

Collect
Comment
Share

Retrieve password

Get verification code
Sure