Municipal
China Railway Consortium won the bid for Changshu Industrial Park Project
Seetao 2021-09-14 16:35
  • After the project is completed, it will greatly optimize the municipal construction of Jiangsu
Reading this article requires
7 Minute

On September 14, 2021, the China Railway Consortium won the bid for the PPP project of the Guli Intelligent Manufacturing Industrial Park and related supporting facilities in Changshu City, Jiangsu. The corresponding pre-qualification document for the Guli Precision Machinery Manufacturing Industrial Park, the Guli Xiongying District Industrial Park; the corresponding qualifications for the Guli Intelligent Manufacturing Industrial Park The pre-review document Guli Shuangying Area Industrial Park.

Changshu Guli Intelligent Manufacturing Industrial Park

The Guli Precision Machinery Manufacturing Industrial Park is located on the south side of Zhennan Street, Guli Town, Changshu City, on the west side of Tieqin Road. The project land area (all construction land) is about 34,910 square meters, the floor area ratio is not less than 2.0, and the building height limit is 60 meters. The green area rate is 10%-20%, the building density is not higher than 60%, and the area of non-productive houses does not exceed 7% of the total area of the plot. The specific construction content includes workshops, supporting talent apartments, and supporting R&D centers.

Guli Intelligent Manufacturing Industrial Park is located in the north of Zhennan Street and east of Tieqin South Street, Guli Town, Changshu City. The project land area (all construction land) is about 36066 square meters, the floor area ratio is not less than 2.0, and the building height limit is 60 meters. The rate is 10%-20%, the building density is not higher than 60%, and the area of non-productive houses does not exceed 7% of the total area of the plot. The specific construction content includes workshops, supporting R&D office buildings, and supporting talent apartments. The reconstruction and expansion project of Changshu East Section of Provincial Highway No. 342 starts from Changshu East Interchange of Changtai Expressway and ends at the intersection of National Highway 524 (East Third Ring Road, Changshu City). The total length of the route is about 7.293km. East section of G204: two-way six-lane first-class highway with a subgrade width of 33m; west section of G204: elevated: two-way four-lane first-class highway; ground: two-way four-lane urban arterial road.

Keywords: engineering construction, engineering news

342 Provincial Highway Changshu East Section Reconstruction and Expansion Project Supporting Project, the new content includes 342 Provincial Highway Changshu East Section Reconstruction and Expansion Project Supporting Sound Barriers, Traffic Safety Facilities, Street Lights, Intelligentization, Greening, and Supporting Bus Stations, Electronic Station System, and Bus Stations Billboards, etc. The total investment of the project is about 3336.2203 million yuan, of which the engineering cost is 2692.2583 million yuan, the other engineering construction costs are 310.422 million yuan, the reserve cost is 150.134 million yuan, and the interest during the construction period is 183,405,400 yuan.Editor/Xing Wentao、Design/Zhangtao

Comment

Related articles

Municipal

Yunnan Jinghong City tourism and health care project starts construction

04-24

Municipal

Guiyang's first batch of affordable housing projects start construction

04-24

Municipal

China will implement domestic in orbit aquatic ecological research projects

04-24

Municipal

Shanghai Haijie Road overhaul project is about to start

04-23

Municipal

$198 million! Road improvement project in Casablanca, Morocco

04-23

Municipal

Shenyang’s largest urban village renovation project starts

04-22

Collect
Comment
Share

Retrieve password

Get verification code
Sure