Transportation
Two major high-speed projects in Anhui Province were approved
Seetao 2021-09-17 09:22
  • Reconstruction and expansion project from Guangde to Xuancheng, with an investment of approximately 13.778 billion yuan
  • The Anhui section of the Nanjing-Hexian Expressway is about 14 kilometers long, with an investment of about 2.588 billion yuan
Reading this article requires
5 Minute

Recently, the G50 Huyu Expressway Guangde-Xuancheng Section Reconstruction and Expansion Project and Nanjing-Hexian Expressway Anhui Section have been approved and approved by the Anhui Provincial Development and Reform Commission, which has laid a solid foundation for the realization of the construction target.

Guangde to Xuancheng Section Project

G50 Huyu Expressway Guangde to Xuancheng Section Reconstruction and Expansion Project The route starts from near the Jiepai parking area in Taozhou Town, Guangde City, connects to the Zhejiang Section of G50 Huyu Expressway, and goes west along the existing route at Jiepai in Taozhou Town. The village near the village is separated from the existing Xuan-Guang Expressway and turned to the northwest. It passes through the north of Guangde City and connects to the existing G50 Shanghai-Chongqing Expressway near Huagu Village in Xiejie Town, and then passes through Cross Town in Langxi County and Honglin Town in Xuanzhou District The southern ring section of Xuanzhou District ends at about 4.3 kilometers south of the Wuxuan hub interchange. The total length of the project is about 91.2 kilometers, and the project investment is about 13.778 billion yuan.

Anhui Section of Nanjing-Hexian Expressway

The Anhui section of the Nanjing-Hexian Expressway starts from the border of Anhui and Jiangsu near Wujiang Town and Shao Village in Hexian County, connects with the planned Nanjing-Hexian Expressway Jiangsu Section, and extends to the southwest through Xiaotang Village in Wujiang Town and Daluo in Xiangquan Town. The village ends near Xiaoyinzhuang, Xiangquan Town, and is connected to Chuma Section of Tiantian Expressway. The total length of the project is about 14 kilometers, and the project investment is about 2.588 billion yuan.

According to reports, with the construction and implementation of these two projects in the future, the integration of the Yangtze River Delta and the development strategy of the Yangtze River Economic Belt will be thoroughly implemented, the interconnection of the Yangtze River Delta region will be further strengthened, the capacity and service level of national expressways will be improved, and the project will be promoted. Economic and social development in the areas along the route. Editor/He Yuting

Comment

Related articles

Transportation

Changtai Yangtze River Bridge enters the sprint stage of full bridge closure

03-28

Transportation

The number of freight trains on the Lancang Mekong Express has exceeded 1000

03-28

Transportation

The construction of the high-speed railway will be completed in 24 years

03-28

Transportation

Lanzhou Air Control Infrastructure Project Starts

03-27

Transportation

The Weisu high-speed railway is about to start construction

03-27

Transportation

Construction of new roads in Minhang, Shanghai begins

03-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure