In recent years, the photovoltaic power generation industry has become the new favorite of the energy industry. Recently, it was learned from the Kunming Municipal Development and Reform Commission that Kunming is actively linking up with the 7.25 million-kilowatt "wind-solar and water-storage integration" demonstration base plan on the lower reaches of the Jinsha River in Yunnan Province during the "14th Five-Year Plan" period. "Integration of wind, wind and water storage" test base.
It is reported that the base will adopt "PV+", highlighting the models of "PV + ecological restoration, PV + rural revitalization, PV + carbon neutral industrial park", and actively explore new energy comprehensive utilization models, and integrate new energy development and ecological restoration, Consolidate the effectiveness of poverty alleviation, rural revitalization, and achieve the dual-carbon goal and other deep integration.
The test base will also explore a comprehensive utilization model of resource conservation and benefit maximization, improve the benefits of comprehensive development of land, resources, and the environment, and realize the transformation of resource development from decentralized to intensive base, and the transformation of industrial development from a single type to a comprehensive type. .
The ecological red line is strictly observed, and the ecological red line, basic farmland, woodland, nature reserve, urban skyline, migratory bird migration channel, highway along the line, overburden mine, access and delivery and other sensitive factors and construction guarantee elements involved in the project construction are carefully monitored. Investigate to ensure that the green background of Kunming's new energy construction is more vivid.
After the completion of the "Integrated Wind, Solar and Water Storage" demonstration base, it will effectively promote the construction of a clean, low-carbon, safe and efficient modern energy industry system in Yunnan Province, and transform the rich green energy advantages into industrial, economic and development advantages.
Yunnan has always adhered to ecological priority and green development, building a national clean energy base, transforming clean energy advantages into economic advantages and development advantages; it also proposed that by 2025, Yunnan will be fully built into a national clean energy base, with the province’s power installed capacity reaching 1.3 About 100 million kilowatts, the proportion of green power installed capacity is over 86%.
During the "14th Five-Year Plan" period, Yunnan will plan to build 31 new energy bases with an installed capacity of 10.9 million kilowatts, and build "integrated wind, solar, and water storage" bases in the lower reaches of the Jinsha River, the middle and lower reaches of the Lancang River, and the Red River Basin and "integrated wind, solar, and fire storage" "The new energy installed capacity of the demonstration project totals 15 million kilowatts.
Keywords: engineering news, engineering construction information
Today, photovoltaic power generation technology products have entered the homes of ordinary people. In addition, Yunnan Province is also accelerating the development and utilization of new energy such as wind and solar energy. In accordance with the principles of overall planning, ecological priority, industrial integration, and effective utilization, 8 million kilowatts of wind power development projects have been deployed in Wenshan, Honghe, and Qujing, and 3 million in Kunming, Chuxiong, and Zhaotong. Kilowatt centralized ground photovoltaic power station project. Editor/Sang Xiaomei
Comment
Write something~