News
Cumulative output of Chongqing Fuling large-scale shale gas field sets record
Seetao 2021-10-09 15:00
  • The gas field has made positive contributions to accelerating the energy transition and ensuring national energy security
Reading this article requires
5 Minute

On October 8, 2021, China's first commercial development of large-scale shale gas field-Sinopec Jianghan Oilfield Fuling shale gas field cumulatively produced 40 billion cubic meters of shale gas, setting a new record for the cumulative production of shale gas fields in China. At present, the gas field produces nearly 20 million cubic meters of gas per day, which can meet the daily gas demand of 40 million households.

The Fuling shale gas field is located in Fuling District, Chongqing City. Since its development and construction in December 2012, it is now China’s sixth largest natural gas field, one of the important gas sources for the Sichuan-East Gas Pipeline, and Sinopec’s “Gasification of the Yangtze River Economic Belt” initiative Important resource base.

"The output of 40 billion cubic meters is a major node, and we will strive to exceed 50 billion cubic meters during the 10th anniversary of the gas field's commissioning next year." The relevant person in charge of Sinopec said.

According to reports, in the face of the world-class problem of shale gas development, Sinopec started from scratch, innovated and integrated five technological systems with Fuling shale gas development characteristics, and realized the efficient development of overpressured shale gas reservoirs shallower than 3,500 meters. Rice gas reservoirs are effectively developed. Keywords: engineering construction, engineering construction information

The relevant person in charge of Sinopec said that he will vigorously implement the green and clean development strategy, continuously enhance the supply capacity of green energy, in-depth promotion of carbon emission reduction and utilization, and accelerate the promotion of high-quality development of the oil and gas industry, in order to achieve the goal of carbon peak and carbon neutrality and guarantee national energy Make new contributions to safety and to promote the sustainable and healthy development of the economy and society. Editor/Sang Xiaomei

Comment

Related articles

News

The second line of the Jiangnao Railway will be officially started in July

04-26

News

Chinese wisdom lights the way for global ecological governance

04-25

News

Guangxi has officially put 8 new berths into operation

04-24

News

Zhongning compressed air energy storage project has been fully launched

04-23

News

Heilongjiang's first wind energy storage project starts

04-23

News

Mission Hills floating wind power platform in the South China Sea

04-23

Collect
Comment
Share

Retrieve password

Get verification code
Sure