On October 25, 2021, the groundbreaking ceremony of the demonstration project of the 2.6 million kilowatt integrated wind-solar-storage base demonstration project in Hengzhou, Guangxi was officially held at the Tiantangling project site in Pingan Village, Mashan Town.
2.6 million kilowatts of wind-solar-storage integration project
According to reports, the total investment of the project is about 12.8 billion yuan, which is the largest single integrated project in Guangxi in 2021. The project is distributed in 17 villages and towns in Hengzhou City, covering the Hengzhou Six Scenic Hydrogen Storage Integration Demonstration Project and Jasmine Hydrogen Storage Integration Project. Yuan Wind Power Co., Ltd. invested and constructed, and China Aneng Group First Engineering Bureau Co., Ltd. was the EPC general contractor. The project will be completed and put into production in 2023. After it is put into operation, the annual average power generation will be about 3.2 billion kWh, which can save about 1.69 million tons of standard coal each year, reduce carbon dioxide emissions by about 6.24 million tons, and reduce sulfur dioxide and nitrogen oxides. And other harmful gas emissions.
Guangxi Hengzhou Million-kilowatt Solar Energy Storage Integration Project is a pragmatic move to accelerate the construction of a green and low-carbon circular development economic system and contribute to the early realization of carbon peak and carbon neutral goals. It is also a pragmatic move to promote green energy and implement the strategy of a strong capital. , The concrete actions to realize the rural revitalization strategy. After the project is completed, it will help accelerate the construction of a new power system with new energy as the main body, and promote the transformation and upgrading of the national energy structure. Editor/He Yuting
Comment
Write something~