On November 9, 2021, Jereh Petroleum and Natural Gas Co., Ltd. successfully won the award letter for the Phase 5 project of the National Jurassic Production Facility in the northern part of Kuwait Petroleum Company. The contract amount exceeded 2.7 billion yuan, setting a record for Jereh’s shares since 1999. Since its establishment, the value of a single contract in the oil and gas market is the highest.
In recent years, the company has continued to pay attention to customer needs, deeply cultivated in the high-end oil and gas market, and has continuously made breakthroughs in market development. This project is after the advent of the UAE National Oil Company’s ADNOC natural gas processing pilot project, the Algerian National Oil Company’s SONATRACH natural gas de-bottlenecking project, and the Tunisian National Oil Company’s ETAP natural gas processing project. Market National Petroleum Corporation's integrated oil, gas, and water treatment and design, manufacturing, procurement, construction, start-up, operation and maintenance of integrated services for large-scale oil and gas facilities projects.
As an international high-end oil company, Kuwait Petroleum Corporation has extremely stringent pre-qualification requirements for global service providers participating in its project bidding. Jereh Oil & Gas Engineering has been conducting pre-qualification for the project since early 2018, and successively organized clarification exchanges with KOC Nearly a hundred times, finally relying on its comprehensive competitive advantage, it became the only Chinese private engineering general contractor shortlisted.
Laying a foundation for the Middle East market
In the final bidding, Jereh Oil & Gas Engineering finally stood out from the fierce competition of the 5 companies participating in the bidding and successfully won the bid at a non-lowest price. This project fully embodies the high trust and recognition of international high-end oil companies in Jereh. It marks that Jereh Oil & Gas Engineering has become an international high-end oil and gas field general contracting service provider. It has important strategic significance for the company’s further development of the Middle and Northeast Africa market. It will fully drive Jereh's internal business in natural gas equipment manufacturing, generators and water treatment equipment, engineering design, operation and maintenance services, etc., to maximize synergy and realize value.
The Jurassic production facility project is located in the Jurassic gas field in northern Kuwait. It is a key strategic production project of Kuwait Petroleum Corporation from 2022 to 2023. The growing demand for natural gas power generation has accelerated the development and utilization of Kuwait’s local natural gas resources and accelerated the transition to a clean energy structure.
The early implementation of JPF 1-3 were contracted by Schlumberger and SPETCO. This time there are two bids, JPF4 and JPF5, JPF4 was executed by SPECTO, and JPF5 was executed by Jereh Oil & Gas Engineering. Under the same project scale, Jereh’s winning bid was about 28 million US dollars higher than the former. The project is divided into two phases, including a 26-month EPCC construction period and a 60-month operation and maintenance service period.
Among them, each production facility plans to process 50,000 barrels/day of crude oil and 150MMscfd of qualified natural gas. The equipment involved are: crude oil processing system, including production manifold, gas/oil/water separator, desalination, crude oil stabilization, crude oil metering and export; gas processing system, including natural gas compression, gas desulfurization and dehydration, refrigeration, flare/acid Gas incineration system, sulfur recovery device and molten sulfur transportation device; water treatment system; and required utilities and auxiliary systems.
Mr. Li Weibin, Vice President of Jereh, said: "This cooperation with KOC is the first breakthrough of Jereh's integrated surface engineering solution for oil and gas fields in the Kuwait market. It is another great feat of Jereh's internationalization strategy in the Middle East! KOC is a leading international high-end oil company. The implementation of this project will effectively enhance Jereh’s brand influence in Kuwait and the entire Middle East and North Africa market, laying a solid foundation for the company to further expand the Middle East and North Africa market. Keywords: overseas engineering, international engineering construction , Foreign Engineering Construction News
Jereh Oil & Gas Engineering will give full play to its comprehensive capabilities in different sectors, adhering to the customer-centric concept, relying on the rich experience accumulated in the execution of overseas oil and gas field surface engineering projects over the years, and its own manufacturing of natural gas, power generation, water treatment and other equipment , Global supply chain, project management and control, operation and maintenance services, etc., to provide the most KOC valued project delivery and commissioning operations, helping Chinese private enterprises to enhance their overseas market visibility and achieve steady development in overseas markets. At the same time, Jereh Oil & Gas Engineering will continue to deepen and intensively cultivate the Middle and Northeast Africa market, and continue to move forward to build the world's leading provider of surface engineering facilities for oil and gas fields and achieve high-quality development of the company. "Editor/XuNing
Comment
Write something~