Macro
Tibet strengthens the construction of water conservancy projects
Seetao 2021-11-25 14:42
  • During the 14th Five-Year Plan, Tibet will improve the construction of Tibet's water network system
Reading this article requires
9 Minute

The construction of water conservancy projects is related to the people's most basic living security. The People's Government of the Tibet Autonomous Region has recently issued the "Guiding Opinions on Further Strengthening the Management of Water Conservancy Project Construction (Trial)" (hereinafter referred to as the "Guiding Opinions").

The “Guiding Opinions” pointed out that it is necessary to further strengthen the preliminary work and investment plan management and promote the reform of investment and financing, increase the preliminary reserves of the project, ensure the quality of the preliminary results, and explore the sources of water conservancy funds; it is necessary to further consolidate the project legal person responsibility system, strengthen the construction supervision, Project quality, safety, progress, capital and land acquisition and resettlement management, strict project acceptance management, standardize the establishment of project legal persons, strictly perform supervision duties, strengthen project construction quality supervision and improve quality supervision efficiency, implement the "three must" responsibilities of safe production, and control Construction progress, standardize fund management, and timely carry out project acceptance as planned to ensure that project benefits are brought into play as scheduled.

The "Guiding Opinions" clearly stated that it is necessary to further standardize project bidding and bidding in strict accordance with the regulations, clarify the responsibility system of the bidder, standardize the bid evaluation work, strengthen the administrative supervision of bidding, and insist on entering the market with "should enter must be entered" and "no transaction outside the market" "the rules. It is necessary to further standardize the order of the water conservancy construction market, strictly control the market access of water conservancy construction project survey, design, construction, supervision, quality inspection and other activities, and accelerate the construction of the credit system.

The "Guiding Opinions" emphasized that efforts should be made to increase environmental protection, strictly observe ecological protection spaces, strictly enforce environmental access conditions, and strengthen environmental quality and ecosystem protection. It is necessary to further strengthen the construction of a clean government, strengthen the prevention and control of clean government risks, keep a close eye on the risk points in the field of engineering construction, weave a dense system cage, and eliminate the phenomenon of "projects are launched and cadres are dismissed."

The Water Conservancy Department of the Tibet Autonomous Region organized a video conference for publicity and implementation of water conservancy bureaus in seven prefectures (cities) and 74 counties (districts) in the region on November 4. Development and Reform Commission of the Tibet Autonomous Region, Department of Finance, Department of Ecological Environment, Department of Agriculture and Rural Affairs, and Emergency Response The management office and other relevant departments participated in the meeting.

After the "Guiding Opinions" was issued, the Tibet Water Conservancy Department held a video conference for the whole district to publicize and implement the contents of the "Guiding Opinions" in detail, requiring the entire district's water conservancy system to fully implement and comprehensively guide the work, so as to provide long-term stability and high-quality development in Tibet. Strong hydraulic support. The Development and Reform Commission of the Autonomous Region, the Department of Finance, the Department of Ecological Environment, the Department of Agriculture and Rural Affairs, the Department of Emergency Management and other relevant departments, as well as the water conservancy bureaus of 7 prefectures (cities) and 74 counties (districts) in the region participated in the promotion and implementation meeting. Editor/Xu Shengpeng


Comment

Related articles

Macro

America's first high-speed rail line broke ground

04-26

Macro

Kazakhstan and the UK sign a strategic partnership agreement

04-26

Macro

The construction of major projects in various regions was accelerated

04-25

Macro

6GW! Australia will launch a tender for large-scale renewable energy projects

04-25

Macro

German startup plans vertical floating photovoltaic power plant

04-25

Macro

China proposes energy law to Support priority development of renewable energy!

04-24

Collect
Comment
Share

Retrieve password

Get verification code
Sure