New Energy
Qinghai Yellow River Yangqu Hydropower Station officially approved
Seetao 2021-12-07 14:51
  • After the completion of the hydropower station, it will rationally develop hydropower resources and promote regional development
Reading this article requires
3 Minute

On December 2, 2021, the National Development and Reform Commission formally issued the "Approval on the Approval of the Qinghai Yellow River Yangqu Hydropower Station Project", which approved the Yellow River Yangqu Hydropower Station.

Yellow River Yangqu Hydropower Station

It is reported that the Yellow River Yangqu Hydropower Station is located on the main stream of the Yellow River at the junction of Xinghai County and Guinan County, Hainan Prefecture, Qinghai Province. The height of the dam is 150 meters, the average power generation capacity for many years is 4.732 billion kWh, and the total investment is 17.06 billion yuan.

Qinghai Yellow River Yangqu Hydropower Station is an important supporting peak-shaving power supply for Qinghai Province’s Qingyu DC UHV transmission channel, and is of great significance to Qinghai Province’s clean energy transmission. In the future, after the completion of the project, the Qinghai Province’s Qingyu DC UHV transmission channel will be able to transmit electricity at full capacity, which will help Qinghai Province to vigorously develop clean energy, build a national clean energy industry highland, and help the country achieve the "dual carbon" goal . Editor/He Yuting

Comment

Related articles

Photovoltaic

Zhilata Floating Photovoltaic Project Successfully Connected to the Grid

05-21

Photovoltaic

Anhui Perovskite Photovoltaic Module + New Energy Project Signing

05-21

Photovoltaic

Hebei Qiancao Expressway Distributed Photovoltaic Project Puts into Operation

05-21

Energy storage

5GWh sodium electric cell +5GWhPack project to land in Xuancheng, Anhui Province

05-21

New Energy

Green energy leads the way: EU sets new record for emissions reductions

05-21

Nuclear power

Dutch nuclear power plans to upgrade:Installed capacity will be further expanded

05-21

Collect
Comment
Share

Retrieve password

Get verification code
Sure