Transportation
5.2 billion! Won the bid for G107 Wuhan East-West Lake Section Highway
Seetao 2021-12-28 11:25
  • National Highway 107 is a very important traffic road for Wuhan. More repairs and improvements are also for everyone to travel better
Reading this article requires
7 Minute

On December 24, 2021, Wuhan Public Resources Tendering and Trading Center issued the announcement of candidates for bidding for G107 Wuhan Dongxihu Section (Gaoqiao 2nd Road to Forehead Bay) rapid transformation and upgrading project, China Railway Construction Engineering, China Construction Third Bureau, Wuhan Municipality is on the list!

Project Overview

The project is located in Dongxihu District, Wuhan, starting at Gaoqiao 2nd Road and ending at the overpass near the Forehead Bay Station of Metro Line 1. The main line of this project is an urban expressway and a first-class highway, and the auxiliary road is an urban main road, which adopts the form of elevated + ground. Among them, the surface road has a total length of 10.375 kilometers, a red line with a width of 50 to 95 meters, and two-way 6-8 lanes. The total length of the elevated road is 9.1085 kilometers, with 6-8 lanes in both directions, 5 sets of parallel ramps are set up across the line, a new interchange of the Fourth Ring Road is built, and a pedestrian bridge is set up on Yiqing Road.

The construction content of this project is the rapid transformation and upgrading of G107 Wuhan East and West Lake Section (Gaoqiao 2nd Road to Forehead Bay). The main line is an urban expressway and a first-class highway, and the auxiliary road is an urban main road, adopting an elevated + ground form. Among them, the surface road has a total length of 10.375 kilometers, a red line with a width of 50 to 95 meters, and two-way 6-8 lanes. The total length of the elevated road is 9.1085 kilometers, with 6-8 lanes in both directions, 5 sets of parallel ramps are set up across the line, a new interchange of the Fourth Ring Road is built, and a pedestrian bridge is set up on Yiqing Road. Simultaneously construct supporting facilities such as transportation, drainage, lighting, electricity, communications, sponge city, and greening. The scope of bidding for this project is: G107 Wuhan Dongxihu Section (Gaoqiao 2nd Road to Forehead Bay) rapid transformation and upgrading project construction drawing design and follow-up full-process technical services (including supplementary design and modification design), equipment procurement, and construction , Trial operation, completion acceptance and defect repair, etc. Does not include the design and construction of street lights, and the construction of traffic engineering.

Winning bid result

1 The bid section was won by China Railway Construction Engineering Group Co., Ltd. and Changsha City Planning and Design Institute Co., Ltd., with a bid price of 1.3 billion yuan; 2 The bid section was won by China Construction Third Bureau Group Co., Ltd. and China Municipal Engineering Zhongnan Design and Research Institute Co., Ltd. , The winning bid price was 2.423 billion yuan; Wuhan Municipal Road and Bridge Co., Ltd., Wuhan Ji'anhang Construction Engineering Co., Ltd., and Wuhan Municipal Engineering Design and Research Institute Co., Ltd. won the bid for section 3, and the winning price was 1.47 billion yuan. Editor/Sang Xiaomei

Comment

Related articles

Transportation

A railway expansion project in Northeast China is about to start construction

03-13

Transportation

China's largest span sea crossing bridge enters critical stage of main cable installation

03-13

Transportation

First Train of Urumqi Metro Line 2 Delivered in Xinjiang

03-13

Transportation

350 kilometers per hour! The Jibin high-speed railway officially laid tracks

03-12

Transportation

49 billion! The Hangzhou Ningbo Expressway renovation and expansion project will start

03-12

Transportation

The renovation and expansion of Xiangyang section of Fuyin Expressway has started

03-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure