Transportation
Construction of Wuzhou-Yulin-Qinzhou Expressway officially started
Seetao 2021-12-30 09:52
  • The project has a total length of 116.9 kilometers, a speed of 120 kilometers per hour, and a total investment of 17.857 billion yuan
Reading this article requires
6 Minute

On December 28, 2021, Guangxi Wuzhou-Yulin-Qinzhou Expressway (Yulin-Pubei Section) PPP project officially started construction.

Yulin-Pubei Section Project

The Yulin-Pubei section, which is currently under construction, is on the south side of Yulin City. It connects the Wuzhou-Yulin-Qinzhou Highway Cangwu to Rongxian section through the existing or planned expressway on the east side of the urban area (construction started on March 30, 2021. Construction), from northeast to southwest, via Pubei County, Qinzhou City, to Lingshan County, Qinzhou City, connected to the Hengqin Expressway (Vertical 5th Line), and enters the southern area of Qinzhou City through the 5th longitudinal line, and finally realizes the connection of the 14th line The whole line runs through.

The starting point of the project is located in Shatian Town, Fumian District, Yulin City, about 5 kilometers south of the Fumian Airport Interchange, and the end point is about 4 kilometers west of Shrike Town, Lingshan County, Qinzhou City. A hub interchange will be set up to intersect the Hengqin Expressway. . The route has a total mileage of 116.9 kilometers, four lanes in both directions, a full subgrade width of 26.5 meters, a split subgrade width of 13.25 meters, 15.5 million cubic meters of filling, 23.42 million cubic meters of excavation, and 1.51 million square meters of road surface. Bridge 35689.5/95 (m/seat), tunnel 10350/10 (m/seat), 9 interchanges (5 hub interchanges, 4 general interchanges), 2 service areas, 2 parking areas, design speed 120 kilometers per hour /Hour.

It passes through Shatian Town and Zhangmu Town in Fumian District of Yulin City, Shuangfeng Town and Yong'an Town in Bobai County, and Pubei County and Lingshan County in Qinzhou City. The Fumian District route is 17 kilometers, the Bobai County route is 15.9 kilometers, the Pubei County route is 52.444 kilometers, and the Lingshan County route is 31.555 kilometers. The estimated total investment is 17.857 billion yuan, of which construction and installation costs are 13.346 billion yuan (Yulin section investment is 4.99 billion yuan, of which construction and installation costs are 4 billion yuan), and the construction period is 3 years.

According to reports, the Wuzhou-Yulin-Qinzhou Expressway is an important highway connecting the Xijiang Economic Belt and the Beibu Gulf Economic Zone in Guangxi. After completion, it will promote the deepening of the economy along the route. Editor/He Yuting

Comment

Related articles

Transportation

Huangbai Railway Town Honghe Bridge Closure

06-12

Transportation

Vietnam plans to fully invest 6.5 billion US dollars in the Ho Chi Minh to Can Tho railway

06-12

Transportation

The Fuhuang section of the Beijing Hong Kong high-speed railway will start construction

06-12

Transportation

CCECC supports the extension construction of light rail in Lagos, Nigeria

06-10

Transportation

Accurate closure of the main bridge of Chongqi Yangtze River Bridge

06-09

Transportation

China continues to optimize and improve its rural road network

06-09

Collect
Comment
Share

Retrieve password

Get verification code
Sure