Transportation
Construction of 5 roads in Xixian New District starts
Seetao 2022-02-24 17:48
  • After the project is completed, it will further improve the level of infrastructure connectivity in the new area
Reading this article requires
6 Minute

On February 24, 2022, the construction commencement ceremony of the interconnected and inter-connected roads between the central urban area of Xi'an and Xixian New Area was held in Fengdong New Town, Xixian New Area. It is reported that the five projects started this time have a total investment of 13.04 billion yuan and a total length of 51.9 kilometers, including the Chenlu-Ketech 2nd Road project, the Kunming Road-Lianhuo Expressway auxiliary road rapid reconstruction project, the Hongguang Road widening and upgrading project, The Afang Road Project and the Xixing Expressway reconstruction and expansion project are planned to be fully completed by the end of 2024.

The Chenlu-Keji 2nd Road project is an express road connecting Xi'an Keji 2nd Road with a total length of 5.4 kilometers. After completion, the main urban area can be quickly connected to the Kunming Chi area, and the connection between the southern part of the new area and Xi'an High-tech Zone will be strengthened.

The Kunming Road-Lianhuo Expressway auxiliary road rapid reconstruction project connects Kunming Road in Xi'an, with a total length of 17.1 kilometers. After completion, it will strengthen the connection between Fengdong New City and the main urban area, and form a fast passage from the West Second Ring Road to the south of Xixian New District.

The Hongguang Road widening and upgrading project is connected to Hongguang Road in Xi'an, with a total length of 4.5 kilometers. After completion, it will build a trunk road channel for convenient connection between Fengxi and Fengdong New Town in Xixian New District and the main urban area of Xi'an.

The Afang 1st Road (West 3rd Ring Road-Xianhu Road) project is the main road, connecting Daqing Road in Xi'an City, with a total length of 15.5 kilometers. After completion, it will be directly connected to the main urban area of Xi'an to the east, and can cross the Fenghe River to the west to reach Xianyang High-tech Zone. The rapid connection between Xi'an City and Fengdong and Fengxi New Town forms a fast channel connecting the West Third Ring Road to the Western Science and Technology Innovation Port.

The Xixing Expressway widening and upgrading project starts from the third bridge toll station in the east and ends at the Xiwu hub interchange in the west, with a total length of 28 kilometers. It adopts the technical standard of two-way eight-lane expressway for reconstruction and expansion. After completion, it will strengthen the connection between Xixian New District and the main urban area. , forming a fast passage from West Second Ring Road to Xixian New District. Editor/He Yuting

Comment

Related articles

Transportation

China and Kazakhstan will cancel transportation quotas by the end of 2026

05-31

Transportation

The first intercity railway R1 line in Quanzhou is under full construction

05-28

Transportation

The main project of the Pinglu Canal waterway has been fully connected

05-28

Transportation

Chongqing Wanzhou High speed Railway Shituo Yangtze River Bridge Main Bridge Closure

05-28

Transportation

Tender for 6 stations of the Fujian section of the Wenfu high-speed railway

05-27

Transportation

The Xiongshang section of the Beijing Hong Kong high-speed railway is about to open

05-27

Collect
Comment
Share

Retrieve password

Get verification code
Sure