Central enterprises
The first section of the Baihe Yujiang Bridge was successfully erected
Seetao 2022-03-03 16:50
  • The world's largest-span double-track ballastless track bridge has successfully erected the steel girder of the first section
Reading this article requires
5 Minute

On March 2, 2022, China Railway Jiuqiao Bridge Engineering Co., Ltd, a subsidiary of CRHIC, participated in the construction of the world's largest span double-track ballastless track bridge - the first section of the new Nanning-Yulin Railway Baihe Yujiang Bridge in Guangxi. The precise erection on the P4 tower on the Nanning side was successful. So far, the on-site hoisting and construction of the steel box girder of the bridge has officially entered the full-scale sprint stage.

The Baihe Yujiang Bridge is a key control project of the Nanyu Railway. The main bridge is located near Baihe Town, Hengzhou City, Nanning City, Guangxi. It is 612 meters long and spans the Yujiang River. The middle span of the beam adopts steel-concrete composite beam, and the side span adopts concrete box girder. The main span is 330 meters. It is the double-track ballastless track bridge with the largest span in the world. technical foundation. The main bridge has two main towers, east and west. The tower is 146 meters high, which is equivalent to the height of a 48-story building. The main tower is a diamond-shaped structure. China Railway No. 9 Bridge mainly undertakes the production and safety tasks of the steel structure of the whole bridge.

The newly built Nanning-Yulin Railway is the first high-speed railway with a speed of 350 kilometers per hour independently invested and constructed by Guangxi. After the project is completed, the time from Nanning to Yulin will be shortened to about 40 minutes. The project will extend eastward to the Guangdong-Hong Kong-Macao Greater Bay Area in the future. The planned total length of the Nanyu-Shenzhen high-speed railway is 629 kilometers. After the completion of the whole line, the space-time distance between Guangxi and the Guangdong-Hong Kong-Macao Greater Bay Area will be greatly shortened. It is of far-reaching significance for the Hong Kong-Macao Greater Bay Area to implement the new mission of Guangxi's "three major orientations" and to achieve the goal of "two completions". Editor/Sang Xiaomei

Comment

Related articles

Central enterprises

The first national standard zero carbon park has landed in Xiong'an Innovation Center

04-29

Central enterprises

CGN Delingha Solar Thermal Benchmark

04-29

Central enterprises

Sinopec deploys DeepSeeker V4 to compete for freshness

04-28

Central enterprises

26.9 billion revenue landed! China Power Construction leads the new energy storage track

04-28

Central enterprises

China Power Construction's pumped storage power dominates nearly half of orders

04-27

Central enterprises

CNCEC achieved a large order of 114.9 billion yuan in the first quarter

04-24

Collect
Comment
Share

Retrieve password

Get verification code
Sure