Uganda Kingfisher Oilfield surface engineering EPC3 general contracting project, with a designed crude oil processing capacity of 40,000 barrels per day (2 million tons per year), the scope of work includes 4 cluster well sites, inter-station pipelines and 1 CPF (central processing station), CPF (Central Processing Station) includes oil and gas gathering and transportation, crude oil processing, associated gas processing, crude oil storage and export, LPG (liquefied petroleum gas) production and loading, produced water and lake water treatment, high-pressure water injection, dual-fuel power stations and other systems. This project is the core part of the surface engineering of Kingfisher Oilfield, aiming to create a model project, a high-quality project and a green environmental protection project that CNOOC, PetroChina and Sinopec cooperate with each other.
The Uganda Kingfisher Oilfield Surface Engineering EPC3 General Contracting Project is one of the Albert Lake oilfield development projects. The Albert Lake oilfield development project is currently China's largest investment project in Uganda. The Belt and Road construction and international energy cooperation are of great significance.
The project operator is Uganda Co., Ltd., a subsidiary of China National Offshore Oil Corporation (“CNOOC”). On February 1, 2022 local time, the first commercial oil discovery in Uganda, with CNOOC as one of the operators, officially launched the full-scale construction of the Albert Lake oilfield project.Editor/Ma Xue
Comment
Write something~