Transportation
Xihe to Dangchang Expressway Engineering Report Approved
Seetao 2022-04-19 16:03
  • The project has a total length of 99.848 kilometers, a total investment of 19.006 billion yuan, and a construction period of 4 years
Reading this article requires
4 Minute

On April 15, 2022, the Gansu Provincial Development and Reform Commission officially approved the feasibility study report of the Xihe-Dangchang Expressway project.

It is reported that the starting point of the Xihe-Dangchang Expressway project is located in Shixia Town, Xihe County. , Baihe, Hanyuan, Nanyang, the end point is located in Baiyangba Village, Linjiangpu, Dangchang County, and is connected to the G75 Lanhai Expressway by a hub interchange. The main line is 99.848 kilometers long, adopts the technical standard of two-way four-lane expressway, and has a design speed of 80 kilometers per hour. The total investment of the project is 19.006 billion yuan, and the construction is financed by the public-private partnership (PPP) model. The construction period is 4 years.

It is reported that the Xihe-Dangchang Expressway is a local expressway project included in the "14th Five-Year Plan for Comprehensive Transportation System Development Plan in Gansu Province" and the "14th Five-Year Plan for Highway and Waterway Traffic Development in Gansu Province". In the future, with the implementation and construction of this project, it will further improve the road network structure in the southern part of Gansu Province, enhance the radiation driving function of the main channel of the national expressway, speed up the construction of the comprehensive three-dimensional transportation network in Longnan, and create a red tourist route. Editor/He Yuting

Comment

Related articles

Transportation

The Suizhou Jingmen Expressway is planned to start construction in December 2026

06-03

Transportation

The traffic in the revolutionary old areas of Gansu has undergone a transformation

06-03

Transportation

China and Kazakhstan will cancel transportation quotas by the end of 2026

05-31

Transportation

The first intercity railway R1 line in Quanzhou is under full construction

05-28

Transportation

The main project of the Pinglu Canal waterway has been fully connected

05-28

Transportation

Chongqing Wanzhou High speed Railway Shituo Yangtze River Bridge Main Bridge Closure

05-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure