On April 18, 2022, the Chongqing Public Resource Trading Supervision Network released the bidding schedule for the survey and design of the construction drawings of the Xingyi Yangtze River Bridge. The total investment of the bridge is about 2.585 billion. Key words: engineering construction information, central enterprise engineering news, Chongqing expressway project information
Project Overview
The bridge is one of the controlled projects of the Dianjiang-Fengdu-Wulong expressway. The preliminary design has been completed. The bridge is located between Fengdu County Downstream Industrial Park and Xingyi Town, close to Fengdu Shuitianping Industrial Park, and a short distance from Fengdu County. The Second Yangtze River Bridge is about 12 kilometers away. The total length of the bridge is 2335m, the main bridge is a 1120m single-span double-layer steel truss suspension bridge, the upper expressway is two-way four-lane, and the lower local road (first-class highway) is two-way four-lane, and the bridge width is 31m. The total investment of the bridge is about 2.585 billion yuan, of which the construction and installation cost is about 2.108 billion yuan. The bridge design should consider both the front and rear approach bridges and the local road connection conditions on both sides of the bridge.
Obtaining tender documents
This bidding project adopts the whole process of electronic bidding. Bidders can download bidding documents and other materials on the Chongqing Public Resource Trading Network before bidding. Deadline for submitting documents: 2022-05-12 10:30. Editor/Zhao E
Comment
Write something~