Hydropower
Guodian Power has obtained the right to develop 3 pumped storage power stations
Seetao 2022-04-30 10:23
  • Guodian Power anchors the target of new energy start-up and production, making positive contributions to the dual carbon goal
Reading this article requires
6 Minute

On April 26, 2022, Guodian Power released its 2021 annual report showing that the company's equity installed capacity is 49.7667 million kilowatts, of which wind power, photovoltaic, hydropower and other non-fossil energy equity installed capacity totals 16.8905 million kilowatts, accounting for 33.94%, more than one-third one.

Guodian Power fully utilizes the advantages of traditional enterprises in the development of clean energy, focuses on the four transformations of "high-end, low-carbon, service-oriented, and digital", vigorously develops clean energy, and promotes the company's green transformation and high-quality development. In terms of hydropower, speed up the construction of the Shuangjiangkou Hydropower Station in the Dadu River Basin and the Kaidu River Basin in Xinjiang. At present, it has obtained the development rights of 3 pumped storage power stations in Anhui, Guangxi and Jiangxi with a total of 3.6 million kilowatts, and the installed capacity of hydropower rights has reached 10.418 million kilowatts, accounting for 20.93%. In terms of new energy, we will give full play to the advantages of grassroots enterprises in multiple areas, continue to promote the development of "site-type" projects, give full play to the advantages of location and resources, make good use of policies, deploy and seize project resources, and make every effort to do a good job in the development of distributed photovoltaics in the county. Strive for the right to develop photovoltaic projects in the county and city where the enterprise is located, and increase the efforts in mergers and acquisitions. At present, the installed capacity of wind power has reached 6.1813 million kilowatts, accounting for 12.42%; the installed capacity of solar photovoltaic has reached 291,200 kilowatts, accounting for 0.59%.

As one of the "troikas" of the new energy development of the National Energy Group, Guodian Power firmly adheres to the new energy development concept, seizes the current window period for the development of the new energy industry, anchors the new energy start-up and production goals, and conducts in-depth research on wind power, photovoltaics, Comprehensive energy, "new energy +" and other policies, accurately grasp the economic structure and new energy consumption in each region, accurately promote the development of new energy, expand resource reserves, and make positive contributions to the realization of the "3060" goal. Editor / Xu Shengpeng


Comment

Related articles

Hydropower

Kazakhstan Usek River Power Station Project Successfully Signed

03-27

Hydropower

ACWA Power successfully refinanced Bahrain's seawater desalination project

03-26

Hydropower

First bin concrete pouring of Chuosijia hydropower Station in Sichuan

03-21

Hydropower

Hebei Lingshou pumped storage energy research review meeting was held

03-21

Hydropower

Gansu Zhangye pumped storage power station construction contract signed

03-20

Hydropower

2.4 billion! Sichuan Nentou won the bid for Xuzhou storage power station project

03-19

Collect
Comment
Share

Retrieve password

Get verification code
Sure