At the construction site of Nanmengxi Bridge on Jianli Expressway in Guizhou, XCMG XGT7527A-18S tower cranes on both sides of the strait are working intensively.
The Nanmengxi Bridge spans the Nanmengxi River, a tributary of the Qingshui River. The bridge has a total length of 987.5 meters, the height of the main tower is 253.5 meters, and the longest main span is 360 meters. The No. 3 and No. 4 piers of Nanmengxi Bridge are the main bearing structures of the bridge. The construction degree of the main tower of the bridge is directly related to the bearing capacity and stability of the bridge. The project party finally decided to use XCMG XGT7527A-18S tower crane products to be responsible for material hoisting .
Since entering the site, XCMG S-series tower cranes have always maintained efficient operation, hooking, hoisting, and landing in one go, with multiple XGT7527A-18S operating at full capacity. The two main piers of the Nanmengxi Bridge have progressed smoothly according to the construction nodes, and have now entered the decisive stage of the construction of the main tower of the platform.Editor/Ma Xue
Comment
Write something~