Transportation
Inner Mongolia east, middle and west expressway will be connected
Seetao 2022-05-16 14:01
  • The total length is about 107.2 kilometers, two-way four-lane, with a total investment of 4.431 billion yuan
Reading this article requires
5 Minute

Recently, the Development and Reform Commission of Inner Mongolia Autonomous Region officially approved the feasibility study report on the project of the last section of the inter-provincial highway, the Zhabaiyintala to Caogaotu section of the Erenhot to Guangzhou National Expressway from Jining to Arongqi.

According to reports, the connecting line between Erenhot and Guangzhou National Expressway from Jining to Arongqi is a highway reconstructed on the basis of the existing inter-provincial highway. The construction project of the whole line is divided into 9 sections, the total length of the main line is about 1324 kilometers, and the total investment scale is about 45.5 billion yuan. It starts from Jining in Ulanqab City in the west and connects with G55 Erguang Expressway and G7 Beijing-Xinjiang Expressway, passing through Ulanqab City, Xilingol League, Chifeng City, Tongliao City, Xing'an League and Hulunbuir City, and ends at Arong Banner in Hulunbuir City.

Erenhot-Guangzhou National Expressway Jining-Arongqi Contact Line Chabaiyintala to Caogaotu Section Project is located in Tongliao City. Chitongjie), connect the Daban to Chabaiyintala section of the connecting line from Jining to Arongqi under construction. The total investment of the project is about 4.431 billion yuan, the main line is about 107.2 kilometers long, and it adopts the standard construction of two-way four-lane expressway.

At present, the connecting line from Jining to Arongqi has been completed and opened to traffic. The five projects under construction, including the section from Daban to Chabaiyintara, and the section from Gongzhugeng to Jingpeng, have resumed construction in an all-round way. After the completion of the whole line, the Inner Mongolia Autonomous Region will realize the convenient connection of the eastern, central and western expressways. Editor/He Yuting

Comment

Related articles

Transportation

The Lagos Light Rail Red Line project has been opened to traffic

03-29

Transportation

Jiangsu Huaguoshan Avenue Renovation Project Starts

03-29

Transportation

Shudao Group signs contract for the Tunisian Besse Bridge project

03-29

Transportation

Changtai Yangtze River Bridge enters the sprint stage of full bridge closure

03-28

Transportation

The number of freight trains on the Lancang Mekong Express has exceeded 1000

03-28

Transportation

The construction of the high-speed railway will be completed in 24 years

03-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure