Interview
S21 Awu Expressway Headquarters Helps Damei Xinjiang Guji Road
Seetao 2022-06-13 14:41
  • The participants of the S21 Awu Project Headquarters work continuously throughout the day to ensure the project is open to traffic
Reading this article requires
2 Minute

The S21 Altay-Urumqi Expressway is China's first desert adventure tourism demonstration expressway integrating transportation and tourism, and it is also an important part of the Xinjiang Silk Road skeleton road network. In the Gurbantunggut Desert, the second largest desert in China, the project headquarters led nearly 10,000 road builders to uphold the Populus euphratica spirit of never giving up, never admitting defeat, and willing to contribute. It only took 11 months. The main line of asphalt pavement was completed within the construction period, paving the road leading to life and hope on the uninhabited Gobi Desert.Editor/Ma Xue

Comment

Related articles

Interview

Anchor on three strategic priorities to drive business growth across Asia Pacific

03-10

Interview

Postdoctoral awarded five-star card, willing to be a bridge for communication

03-04

Interview

Yang Sen: I want to add fuel to Xinjiang's industrial strength

03-03

Interview

Pakistan and Afghanistan engage in intense fighting

02-27

Interview

A senior journalist from Kazakhstan's' Kashgar Surprise '

02-27

Interview

When Muqam meets Yu Opera, a cultural harmony that spans mountains and rivers

02-26

Collect
Comment
Share

Retrieve password

Get verification code
Sure