On June 10, 2022, the groundbreaking ceremony of the Moqi 500,000-kilowatt wind and scenery project invested and constructed by China Huaneng was held in the Moli Dawa Daur Autonomous Banner, Hulunbuir City, Inner Mongolia. It is reported that the start of construction of the project marks a major breakthrough in the development of Moqi's new energy industry, which will add a strong impetus to the high-quality economic and social development of Moqi.
According to reports, the 500,000-kilowatt wind and solar project in Moqi is part of Huaneng’s 1 million-kilowatt wind and solar project in Mengdong Yimu DC to Lingdong. La Town, the project investment is 1.044 billion yuan, the operation period is 25 years, and the average annual power generation is 385,708.75 MWh; the 300,000-kilowatt wind power project is located about 110 kilometers northwest of Moqi, with an investment of 1.571 billion yuan and a 25-year operation period. , the average annual power generation is 914,291.25 MWh. After the project is completed, it will make positive contributions to promoting the clean and low-carbon transformation of energy in Hulunbuir area, reducing environmental pollution, promoting energy conservation and emission reduction.
Meng Huiliang, director of Huaneng Lingdong Construction Office and general manager of Huaneng Moridawa New Energy Co., Ltd., said that the 500,000-kilowatt wind and solar project can save 938,000 tons of standard coal, reduce carbon dioxide emissions by 2.44 million tons, and pay 46 million yuan in profits and taxes each year. .
In recent years, Moqi has adhered to the road of high-quality development with ecological priority and green development as the guide, coordinated the promotion of epidemic prevention and control and project implementation, and actively established a green environment with Huaneng Inner Mongolia Eastern Energy Co., Ltd. Low-carbon and circular development of the economic system, accelerate the clean and low-carbon transformation of energy in eastern Mongolia, and work together to build a new energy output base. Editor/He Yuting
Comment
Write something~