Central enterprises
Won the bid for the Tail Renovation Project in the Lower Ganjiang River
Seetao 2022-06-17 09:25
  • The total investment of the project is about 11.23 billion yuan, and the engineering cost control price is 7.2 billion yuan
Reading this article requires
6 Minute

On June 15, 2022, Jiangxi Public Resources Trading Center released the announcement of the bid-winning results of the general contracting project for the design, procurement and construction of the comprehensive renovation project of the lower reaches of the Ganjiang River. .

Project Overview

The comprehensive renovation project for the tail lug in the lower reaches of the Ganjiang River is composed of the Nanchang Water Control Project of the Ganjiang River, including the main branch, the north branch, the middle branch and the south branch, and the Zhoutou protection project including the protection of Yangzizhoutou and Jiaojitou. The Nanchang Water Conservancy Project and Zhoutou protection measures regulate the water level of the taillu river in the lower reaches of the Ganjiang River during the dry season, maintain the spatial pattern of urban water ecology, and highlight the water ecology of Nanchang City. The characteristics of water culture and water landscape can enhance the quality of the city, and lay the foundation for optimizing the regional water resources allocation pattern, improving the conditions of water intake, and promoting the development of shipping. The main branch, north branch, middle branch and south branch of the Ganjiang River are set up with 4 river gates; the protection length of the Zhoutou protection project is 9.32 kilometers, of which the Yangzizhoutou is 3.67 kilometers, and the Jiaojitou is 5.65 kilometers; the scale of the project is II and other large projects; The main branch hub is composed of sluice lock, ship lock, fishway and connecting water barriers; the north branch hub is composed of sluice lock, fishway and connecting sections of the left and right banks; the middle branch hub is composed of sluice lock, reserved ship lock, fishway and The left and right bank connecting sections are composed; the south branch hub is composed of sluice gate, ship lock, fishway and connecting section; Zhoutou revetment adopts hinge row revetment and prefabricated ecological frame revetment; Jiaojitou adopts dry block stone, hinge row, ecological concrete block, self-locking concrete block revetment and other types. Project location: Nanchang Xinjian District, Nanchang County, High-tech Zone, Donghu District, Economic Development Zone; the total investment of the project is about 11.23 billion yuan, of which the control price of this bidding design fee is 85 million yuan, and the engineering cost control price is 7.2 billion yuan . Keywords: engineering news, engineering construction information, engineering construction

Bidding Information

This project was won by China Water Resources and Hydropower Eighth Engineering Bureau Co., Ltd. with a bid price of 6.87 billion yuan. Congratulations to the winning bidder! Editor/Zhao E

Comment

Related articles

Central enterprises

CSCEC signed a strategic cooperation agreement with Guangzhou City

04-26

Central enterprises

The first batch of equipment shipment for Huanghua Port Automation Project

04-26

Central enterprises

Chinese ship Wen Gang and French total energy shipping high-level meeting

04-25

Central enterprises

Gansu Jiantou and Weiyang District Government Cooperation Symposium

04-24

Central enterprises

Prime Minister of Pakistan Visits Saudi Arabia to Invest in Major Projects

04-22

Central enterprises

Assistance to the Bahamas National Stadium Maintenance and Renovation Project

04-19

Collect
Comment
Share

Retrieve password

Get verification code
Sure