News
Ninety percent of the first wind power photovoltaic bases in China started
Seetao 2022-06-22 16:29
  • Up to now, the total installed capacity of photovoltaic power generation projects under construction is 121 million kilowatts
Reading this article requires
2 Minute

In June 2022, a number of photovoltaic energy projects will start construction in Weinan in Shaanxi, Yuxian in Hebei, Loudi in Hunan and other places, with a total installed capacity of more than 7 million kilowatts and a total investment of about 60 billion yuan.

Up to now, the total installed capacity of photovoltaic power generation projects under construction is 121 million kilowatts. Nearly 90% of the first batch of 100 million kilowatt large-scale wind power photovoltaic bases in China, that is, wind power and photovoltaic comprehensive utilization bases, have started.

Li Chuangjun, Director of the New Energy Department of the National Energy Administration: By 2025, the power generation of renewable energy will reach 3.3 trillion kilowatt-hours, accounting for more than 50% of the total electricity consumption of the whole society. The power has to be doubled.Editor/Ma Xue

Comment

Related articles

News

The first railway train to operate after the closure of Hainan Free Trade Port

03-20

News

The freight volume of the Golden Canal exceeds that of the railway

03-19

News

Tianshan natural gas exceeds 1 billion cubic meters

03-19

News

The performance of the Western Land Sea New Channel is impressive

03-18

News

China launches pilot program for comprehensive application of hydrogen energy

03-17

News

China's spring irrigation work is fully underway

03-17

Collect
Comment
Share

Retrieve password

Get verification code
Sure