Photovoltaic
Ordos announced the 14th Five-Year Energy Development Major Project Library
Seetao 2022-06-29 14:21
  • 67 key photovoltaic projects with a total scale of 37.5GW
  • In the 14th Five-Year Plan, strive to achieve the strategic goal of reaching 50 million kilowatts of new energy installed capacity, accounting for 50% of the total installed capacity
Reading this article requires
3 Minute

Recently, the Office of the People's Government of Erdos City, Inner Mongolia issued a notice on the "14th Five-Year Plan" energy comprehensive development plan. The notice pointed out that during the "14th Five-Year Plan" period, the installed scale of wind power and solar power generation will grow rapidly, and the city's new electricity demand will be mainly driven by renewable energy sources. energy supply. By 2025, the installed capacity of renewable energy will strive to reach 50 million kilowatts, and the installed capacity of renewable energy will account for more than 50% of the total installed capacity of electricity, of which the installed capacity of wind power will reach about 10 million kilowatts, and the installed capacity of photovoltaic power generation will reach about 40 million kilowatts.

During the 14th Five-Year Plan period, there are 67 key photovoltaic projects with a total scale of 37.5GW. The types of projects include distributed photovoltaics, county-wide distributed, photovoltaic bases, complementary fishing and photovoltaics, and photovoltaic desertification control. Editor / Xu Shengpeng

Comment

Related articles

Photovoltaic

New solar power station to be built in northern Lome, Togo

09-11

Photovoltaic

Indonesia Launches 100GWp Solar Program with Huge Investment Potential

09-08

Photovoltaic

Finland Solar: 1.56GW Installed, 26.6GW in Pipeline

09-07

Photovoltaic

Ariguan í Photovoltaic Transmission Line in Colombia Approved for Environmental Permit

09-07

Photovoltaic

Xilingol 200000 kW Photovoltaic Project Successfully Connected to the Grid

09-06

Photovoltaic

Oman launches 3GW photovoltaic plan

09-06

Collect
Comment
Share

Retrieve password

Get verification code
Sure