News
Jiangxi CREG Unveiled and Nanchang Shield Machine Offline
Seetao 2022-06-30 10:44
  • Jiangxi CREG is determined to provide better products for rail transit, pumped storage and other fields in Jiangxi Province
Reading this article requires
2 Minute

On the morning of June 29, 2022, Jiangxi CREG, which was jointly established by CREG and Nanchang Rail Transit Group, was officially unveiled in Jiangxi Nanchang Rail Transit Industrial Park. The first batch of shield machines jointly developed by the two parties were successfully rolled out.

the opening ceremony

Group photo of three shields

The three shield machines off the assembly line are about 83.89 meters long, 6.28 meters in excavation diameter and 500 tons in weight. They will be used for the construction of Nanchang Rail Transit Line 1 North Extension, East Extension and Line 2 East Extension Projects . The equipment is equipped with many new processes and technologies, which will surely add new assistance to the safe and efficient construction of Nanchang subway tunnels.Editor/Ma Xue

Comment

Related articles

News

Zhongning compressed air energy storage project has been fully launched

04-23

News

Heilongjiang's first wind energy storage project starts

04-23

News

Mission Hills floating wind power platform in the South China Sea

04-23

News

The world's highest altitude wind power project welcomes new progress

04-22

News

Inner Mongolia Hohhot Municipal People's Livelihood Project Starts

04-19

News

Linze Pingchuan photovoltaic power generation project starts construction

04-17

Collect
Comment
Share

Retrieve password

Get verification code
Sure