News
Jiangxi CREG Unveiled and Nanchang Shield Machine Offline
Seetao 2022-06-30 10:44
  • Jiangxi CREG is determined to provide better products for rail transit, pumped storage and other fields in Jiangxi Province
Reading this article requires
2 Minute

On the morning of June 29, 2022, Jiangxi CREG, which was jointly established by CREG and Nanchang Rail Transit Group, was officially unveiled in Jiangxi Nanchang Rail Transit Industrial Park. The first batch of shield machines jointly developed by the two parties were successfully rolled out.

the opening ceremony

Group photo of three shields

The three shield machines off the assembly line are about 83.89 meters long, 6.28 meters in excavation diameter and 500 tons in weight. They will be used for the construction of Nanchang Rail Transit Line 1 North Extension, East Extension and Line 2 East Extension Projects . The equipment is equipped with many new processes and technologies, which will surely add new assistance to the safe and efficient construction of Nanchang subway tunnels.Editor/Ma Xue

Comment

Related articles

News

China's 42nd Antarctic Expedition Enters a Critical Period of Inland Expansion

01-06

News

The world's first 30 MW pure hydrogen gas turbine has been officially put into operation

01-06

News

The first desert heavy-duty railway in Africa has been fully opened!

01-06

News

Intelligent manufacturing empowers the future!

01-05

News

The joint construction of the backbone power grid between China and Laos has started

01-04

News

Deep in the desert, the 'new oil field' lights up thousands of homes

01-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure