Transportation
Harbin Rail Transit Phase II Construction Planning Announcement
Seetao 2022-07-12 10:29
  • During the 14th Five-Year Plan, Harbin will start the construction of the first phase of Metro Line 4 and the first phase of Line 5
  • The total mileage of the project is 70.6 kilometers, of which the first phase of Line 5 is 36.1 kilometers long and has 25 stations.
Reading this article requires
7 Minute

On July 9, 2022, a reporter from Seedao.com learned from the official website of Harbin Metro that the "Harbin Rail Transit Phase II Construction Plan (2022-2027) Social Stability Risk Analysis Public Participation Information Publicity" was announced.

Project Overview

The second phase construction plan of Harbin Rail Transit (2022.2027) includes the first phase of Line 4 and the first phase of Line 5, with a total mileage of 70.6 kilometers.

The first phase of Line 4: from Qiansha Station in Songbei District, mainly along Shimao Avenue, Songbei 1st Road, Xuehai Street, Zhongyuan Avenue, Jiangbei Green Axis, Kaiyuan Street, Chengde Street, Sanxing Street, Dacheng Street, Xuanhua Street, Heping Road and Haping Road are laid, and the terminal ends at the Nationalities College Station. The total length is 34.5 kilometers. There are 29 stations, 1 Haping Road parking lot, and 1 Qiansha depot.

Phase 1 of Line 5: Starts from Nanjing Road Station in Hulan District, mainly along Nanjing Road, Xiang'an North Street, Xiang'an South Street, Jingjiang West Road, Kang'an Road, Second Ring Road, Three Power Roads, and Jinxiang Street Laying, ending at East Third Ring Road Station, with a total length of 36.1 kilometers, 25 stations, 1 Ha-A parking lot, and 1 Songbei depot.

Therefore, the long-awaited Harbin Metro Lines 4 and 5 are finally about to start! According to the "14th Five-Year" Comprehensive Transportation System Development Plan of Heilongjiang Province: During the "14th Five-Year Plan" period, Harbin will start construction 4 Phase 1 of Line 1 and Phase 1 of Line 5 work.

The first phase of Line 4 has a total of 29 stations, running through four areas: Songbei District, Daowai District, Nangang District and Xiangfang District. At the same time, Line 4 is planned to have 15 stations in Songbei District.

Passing through the Shenzhen-Harbin Plate, Shimao Plate, and Songpu Plate, to a large extent, the public transportation facilities along the line have been improved to a large extent, bringing convenience to the people in the new area. class.

The first phase of Line 5 has a total of 25 stations, passing through four areas: Songbei, Daoli, Nangang and Xiangfang. At present, the direction of the station in Songbei District is different from that of Line 4. It is connected to Daoli District through Limin East and Shimao blocks, which can solve the traffic problem of Limin, reduce the travel time of residents, and make it more convenient to go to the urban area. In addition, Line 5 can be transferred with Line 4 at West Third Ring Road Station and Dongli Square Station, with Line " at Hexing Road, and with Line 3 at Jinxiang Street.

It is worth noting that the opening of Line 5 can effectively relieve Jinxiang Street. The flow of people on the East Third Ring Road has played an important role in improving traffic conditions. Editor / Xu Shengpeng


Comment

Related articles

Transportation

A railway is changing the logistics map of East Africa

07-25

Transportation

Chinese Firms Build Uzbekistan Highway, Forging New Eurasian Logistics Corridor

07-24

Transportation

Tanzania lays foundation for $2.74 billion standard gauge railway project

07-23

Transportation

The Sichuan Tibet Railway rewrites the spatiotemporal pattern of snow covered areas

07-23

Transportation

CRRC New Trains Trial Run Upgrades Brazil's Subway System

07-22

Transportation

Chinese Firms Build Key Tanzanian Railway for East African Connectivity

07-21

Collect
Comment
Share

Retrieve password

Get verification code
Sure