Transportation
Lueyang Section of Kangluo Expressway officially started
Seetao 2022-07-20 10:42
  • The total length is 41 kilometers, two-way four-lane, the speed is 100 kilometers per hour, and the width of the roadbed is 26 meters
  • After the completion of the project, it will be of great significance to accelerate the high-quality economic and social development of Shaanxi, Gansu and Sichuan
Reading this article requires
3 Minute

Recently, Baijiaba was held in Hengxianhe Sub-district, Lueyang County, Hanzhong City, and the construction mobilization of Luekang (Lueyang County, Hanzhong City to Kang County, Longnan City) expressway construction mobilization and the pilot project of Shanshui painting scroll in southern Shaanxi, a transportation powerhouse, were held.

Lueyang Section of Kangluo Expressway

It is reported that the Kangluo Expressway has a total length of 41 kilometers, a design speed of 100 kilometers per hour, a roadbed width of 26 meters, two-way four-lane, and an estimated total investment of 7.1 billion yuan. There are 43 bridges of 19,256 linear meters and 8 tunnels, with a total length of 13,622 linear meters, and bridges and tunnels account for 78.69% of the total. There are 4 interchanges, covering an area of about 3,819 acres.

With the construction of Kangluo Expressway, Kangxian will also take the east wind of traffic to vigorously develop the county economy. At that time, a rapid traffic circle will be formed in 1 hour from Kangxian to Longnan, 2 hours from Kangxian to Tianshui, and 2 hours from Kangxian to Hanzhong. Improve the comprehensive transportation capacity of Longnan City, which connects the east and the west, and helps Kangxian County truly enter the era of high-speed. Editor/He Yuting

Comment

Related articles

Transportation

The Suizhou Jingmen Expressway is planned to start construction in December 2026

06-03

Transportation

The traffic in the revolutionary old areas of Gansu has undergone a transformation

06-03

Transportation

China and Kazakhstan will cancel transportation quotas by the end of 2026

05-31

Transportation

The first intercity railway R1 line in Quanzhou is under full construction

05-28

Transportation

The main project of the Pinglu Canal waterway has been fully connected

05-28

Transportation

Chongqing Wanzhou High speed Railway Shituo Yangtze River Bridge Main Bridge Closure

05-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure