Product
China Construction Eighth Bureau launched the first unmanned beam factory
Seetao 2022-07-21 09:26
  • China's first unmanned beam factory was officially launched in China Construction Eighth Bureau
Reading this article requires
3 Minute

On July 20, 2022, the kick-off meeting of China Construction Eighth Bureau Unmanned Beam Factory (UBF) was successfully held in Henan Yanhuang Expressway project. The launching ceremony also unveiled the China Construction Eighth Engineering Group Co., Ltd. Joint Research Center for Intelligent Assembly and Innovation of Reinforced Frames.

The unmanned beam factory adopts an industrialized model to organize production, and at the same time integrates intelligent technologies such as big data, artificial intelligence and the Internet of Things to realize a smart factory that automates the entire process from material transportation, semi-finished product processing to finished product assembly.

The R&D team continues to tackle key problems, innovating "three-in-one" intelligent forming and loading of stirrups, automatic processing and distribution of longitudinal bars, streamlined installation of steel skeletons, full-cycle flexible production of formwork, intelligent concrete vibrating and quality feedback control, and prestressed steel beams. Six core key technologies of automatic weaving. Developed 26 sets of black technology equipment series such as three-in-one installation machine for steel skeleton and intelligent concrete vibration-removing machine, and applied for 89 patents.Editor/Ma Xue

Comment

Related articles

Product

Delivery of 1200 ton wind power installation platform for Chinese ships

07-27

Product

Yancheng Canadian Solar energy storage products enter the market

06-29

Product

China's first large cruise ship Aida Modu officially out of dock

06-07

Product

Zoomlion " Jinpeng " سلسلة 23mpa سيارة مضخة الوزن

06-02

Product

1200 standard square alkaline water hydrogen production electrolyzer offline

05-26

Product

Birth of the first domestically produced 150 MW-class large-scale impact runner

05-16

Collect
Comment
Share

Retrieve password

Get verification code
Sure