Construction
The main body of the terminal building of Lanzhou Zhongchuan Airport is capped
Seetao 2022-07-29 09:40
  • After the completion of the third-phase expansion of Zhongchuan Airport, it will meet the annual passenger throughput of 38 million
Reading this article requires
2 Minute

On the morning of July 28, 2022, as the last cubic meter of concrete was poured, the main concrete structure of the terminal building of the Lanzhou Zhongchuan International Airport Phase III Expansion Project was fully capped, 33 days ahead of schedule.

Lanzhou Zhongchuan International Airport Phase III Expansion Project is a major project of Gansu Province's "13th Five-Year" comprehensive transportation development plan, and an important supporting project for Gansu Province to build the "Silk Road Air Corridor", including airport engineering, air traffic control engineering, supply Oil engineering, etc., among which terminal building is an important part of airport engineering.Editor/Ma Xue

Comment

Related articles

Construction

Hebei TV praises Shantui's intelligent construction products

05-08

Construction

The track laying of the Xiangyang-Jingzhou High-speed Railway has started!

03-18

Construction

Shuangyashan Green Aviation Fuel Base officially launched

10-16

Construction

The autumn centralized construction of China's first heavy-duty Daqin Railway

10-08

Construction

The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

09-30

Construction

Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

09-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure