Transportation
Guangxi Tian'e-Beihai Highway Bama to Pingguo section project won the bid
Seetao 2022-08-14 09:34
  • The total length of the project route is 56.578km, and the bidding price of this project is about 10.4 billion yuan
  • The project adopts the standard construction of two-way six-lane expressway, the design speed is 100km/h, and the roadbed width is 33.5m
Reading this article requires
6 Minute

Recently, the Guangxi Zhuang Autonomous Region Public Resource Trading Center released the announcement of the winning bid for the design and construction of the Tian’e-Beihai Highway from Bama to Pingguo (Bama to Qiangxu). billion.

Project Overview

The Bama-Pingguo section of the Tian'e-Beihai Highway is an important part of the 10-long Tian'e-Beihai Expressway connecting Guizhou in the "Guangxi Expressway Network Planning (2018-2030)".

Main line: The Bama-Pingguo section of the Tian'e-Beihai Highway starts from near Linlan Village, Xishan Township, Bama County, and connects to the Tian'e-Beihai Highway from Tian'e to the Bama section via Fengshan. Zhuan Town, Cifu Lake Scenic Spot in Bama County, Yixu Township, Yantan Reservoir, and Qiangwei Township in Dahua County, along with the Du’an-Bama Expressway, were reconstructed and expanded for about 7.734km to the vicinity of Hongchou Village, the end point of the project. The total length of the route is 56.578km, of which 48.844km is newly built and 7.734km is renovated and expanded. It adopts the standard of two-way six-lane expressway, the design speed is 100km/h, and the roadbed width is 33.5m. Set up 11788.4m/26 bridges, 5 interchanges, 1 separate interchange, 4 vehicle overpasses, 52 passages, 2 service areas, 1 monitoring and communication sub-center, 1 tunnel management station, road administration management 1 station, 2 ramp toll stations, 1 maintenance area. Keywords: engineering news, engineering construction information, engineering construction

Jiangping branch line: The total length of the line is 5.715km. It adopts the standard of two-way four-lane expressway. The design speed is 80km/h and the width of the roadbed is 24.5m. Set up 1171m/5 bridges, 866m/3 tunnels, 3 interchanges, and 1 ramp toll station.

Min'an connecting line: The total length of the route is 15.617km, and it adopts the second-class highway standard, the design speed is 40km/h, and the width of the roadbed is 12m.

Bama connecting line: The total length of the line is 4.244km, and it adopts the second-class highway standard, the design speed is 40km/h, and the width of the roadbed is 8.5m.

Bama East Connecting Line: The total length of the line is 1.87km. It adopts the second-class highway standard, the design speed is 40km/h, and the width of the roadbed is 12m.

Yixu connecting line: the total length of the route is 1.50km. It adopts the second-class highway standard, the design speed is 40km/h, and the width of the roadbed is 12m.

Bidding Information

This project was won by Guangxi Changchang Road and Bridge Construction Co., Ltd., Guangxi Traffic Design Group Co., Ltd., and Guangxi Jiaoke Group Co., Ltd., with a bid price of 10.464 billion yuan. Congratulations to the winning bidder!  Editor/Zhao E

Comment

Related articles

Transportation

Construction of $211 million Philippine highway begins

04-23

Transportation

The first tunnel project of Jilin Bailin Expressway starts

04-22

Transportation

The railway is expected to open by the end of this year

04-22

Transportation

Construction of Lanxi Section of Jianwu Expressway is about to begin

04-19

Transportation

Nanchang will add a new expressway to Chaozhou

04-18

Transportation

The signing ceremony for Kazakhstan's first urban light rail project was held

04-18

Collect
Comment
Share

Retrieve password

Get verification code
Sure