News
Jinzhou Port to Helsinki China Railway Express starts
Seetao 2022-08-17 15:02
  • This train will add an international logistics channel from the northeast region to the southeast coast of China
Reading this article requires
3 Minute

On August 16, 2022, the "Jinzhou Port-Helsinki" China-Europe train successfully cleared customs at Zhun Gadabuqi Port in Xilin Gol League, Inner Mongolia Autonomous Region and left the country, marking the first "Jinzhou Port-Helsinki" China-Europe multimodal transport Shipped successfully.

It is the first time for Jinzhou Port to carry out the trial operation of container transportation, sorting out domestic and foreign business, and customs clearance process through the Choibal Mountain in Mongolia and the Russian-Siberian Railway to Helsinki, the capital of Finland. It also means that the Northeast Land-Sea Corridor, as an international cargo channel, can provide a new logistics channel option for material transportation between East Asia and Europe.

The "Jinzhou Port-Helsinki" China-Europe freight train loaded with stones has a total travel distance of more than 8,000 kilometers. It was loaded and departed at Jinzhou Port 2 days ago, and arrived at the Zhun Gadabuqi Port along the Northeast Land-Sea New Corridor. After going through the customs clearance procedures , will go through the Mongolian Biqigetu port on August 16, 2022 to the Mongolian Qiaobashan Bayintumen Railway Station, which is 380 kilometers away, and then transit at Erinqab, and transport it to the Siberia Railway to Helsinki, the capital of Finland, and then diverted to Europe for sales.Editor/Ma Xue

Comment

Related articles

News

Inner Mongolia Hohhot Municipal People's Livelihood Project Starts

04-19

News

Linze Pingchuan photovoltaic power generation project starts construction

04-17

News

Qinghai photovoltaic industry accelerated the rise

04-17

News

China's high-speed rail will soon have a speed of over 400 kilometers per hour

04-16

News

Greek Thrace wind power project

04-09

News

Mulei South 750 kV power transmission and transformation project started

04-07

Collect
Comment
Share

Retrieve password

Get verification code
Sure