On the evening of September 1, 2022, Indonesia time, after 11 days of sea transportation, China's high-speed EMU and comprehensive inspection train exported to Indonesia for the Jakarta-Bandung high-speed railway arrived at the Jakarta port in Indonesia from Qingdao, China. This is the first batch of the Jakarta-Bandung high-speed railway project. A high-speed train arriving in Indonesia.

On August 21, a group of high-speed EMUs and a group of comprehensive inspection trains were successfully loaded at Qingdao Port and sent to Indonesia by sea. This is the first batch of trains of the Jakarta-Bandung high-speed railway, marking the official departure of China's first high-speed train exported to foreign countries.

The Jakarta-Bandung high-speed railway is a landmark project for China and Indonesia to jointly build the Belt and Road Initiative and deepen pragmatic cooperation. China Railway International Co., Ltd., a subsidiary of China National Railway Group Co., Ltd., organized the design and manufacture of CRRC Qingdao Sifang Locomotive and Rolling Stock Co., Ltd., one of the members of the Jakarta-Bandung High-speed Railway Chinese Enterprise Consortium. It is the first high-speed train to be exported from China.

The train adopts Chinese standards and is tailor-made for the Jakarta-Bandung high-speed railway. The maximum operating speed is 350 kilometers per hour, with 4 moving, 4 pulling, and 8 formations. Relying on the advanced and mature technology of Fuxing Chinese standard EMUs, it adapts to the local operating environment and line conditions in Indonesia, and integrates with the local Indonesia. culture, make adaptive improvements. Editor/He Yuting
Comment
Write something~