Transportation
Guangfo Ring Road Foshan West to Guangzhou North Project won the bid
Seetao 2022-09-15 09:50
  • The total approved budget for this project is 22.641 billion yuan, and the total construction period of the project is 5 years
  • The total length of the project line is 47.023 kilometers, and there are 9 stations on the whole line
Reading this article requires
5 Minute

On September 14, 2022, the Guangzhou Public Resources Trading Center released the announcement of the winning candidates for the general contracting of the project from Foshan West Station to Guangzhou North Station of the Pearl River Delta Intercity Rail Transit Guangfo Ring Line. The body won the bid, the total estimated budget of the project was 22.641 billion yuan, and the total construction period of the project was 5 years.

Project Overview

The Pearl River Delta Intercity Rail Transit Guangfo Ring Line from Foshan West Station to Guangzhou North Station starts from Foshan West Station, passes through Nanhai District, Huadu District and Baiyun District, and ends at Guangzhou North Station.

The total length of the project line is 47.023 kilometers. There are 9 stations on the whole line, namely Foshan West (excluding), Shishan East, Dalan, Guanyao South, Hegui, Tanbu, Huadu Port, Shenshan North, Guangzhou North (not included) Including) and other stations, and 7 new stations will be built. The project has 1 vocational training section of the intercity railway.

Railway grade: intercity railway; number of main lines: double lines; design speed: 200 km/h, speed limit in local sections. Keywords: engineering news, engineering construction information, engineering construction

Bidding scope and division of tenders

The construction general contracting project from Foshan West Station to Guangzhou North Station of Guangfo Ring Line includes the following contents:

Bidding Information

The first winning candidate for this project: China Railway Group Co., Ltd., China Railway No. 1 Group Co., Ltd., China Railway No. 3 Group Co., Ltd., China Railway No. 4 Group Co., Ltd., China Railway Sixth Group Group Co., Ltd., China Railway Tenth Group Group Co., Ltd., A consortium composed of China Railway Guangzhou Investment Development Co., Ltd., China Railway Guangzhou Engineering Bureau Group Co., Ltd., and China Railway Tunnel Bureau Group Co., Ltd. The bid price is 9.19 billion yuan. Congratulations to the winning bidder! Editor/Zhao E

Comment

Related articles

Transportation

Chinese enterprises build roads in Africa, 6 hours to 1.5 hours!

01-06

Transportation

South Asian trade hub rising, Navasheva port leading India's port expansion and upgrading

01-06

Transportation

Tashkent suburban railway will be fully accelerated!

01-06

Transportation

The 19 billion railway PPP project in S ã o Paulo state, Brazil is about to be tendered

01-06

Transportation

Gaimei Port: Vietnam's emerging deep-water port, empowering port industry

01-05

Transportation

CRRC Dalian made locomotive arrives in Malaysia! CCCC Ma Dong Railway Project

01-05

Collect
Comment
Share

Retrieve password

Get verification code
Sure