Construction Frontline
Goldwind signs contract for 500MW wind power project in Uzbekistan
Seetao 2022-09-16 11:15
  • After the project is completed, the local power structure will be improved, which can meet the power needs of 500,000 households
  • The total installed capacity of this project is 500MW, and 111 GW155-4.5MW permanent magnet direct drive intelligent wind turbines are selected
Reading this article requires
6 Minute

Recently, Goldwind successfully signed a contract for the Zarafshan 500MW wind power project in Uzbekistan, achieving a major breakthrough for Goldwind in the Uzbekistan market. This project is the largest single project in Uzbekistan and even in Central Asia.

The project was invested by Masdar, a future energy company in Abu Dhabi. Power China Shandong Power Construction Third Engineering Co., Ltd. implemented the general contracting, and the International Finance Corporation, the Asian Development Bank, the European Bank for Reconstruction and Development and other syndicated financing. Recognition of Goldwind by the financing market.

GW155-4.5MW permanent magnet direct drive intelligent wind turbine

The Zarafshan project is located in the Navoi region of central Uzbekistan. The total installed capacity of the project is 500MW. Goldwind selected 111 GW155-4.5MW permanent magnet direct-drive smart wind turbines. return on investment. The project is scheduled to be shipped in the third quarter of 2022 and completed by the end of 2024. After completion, the local power structure will be significantly improved, which can meet the power needs of 500,000 Uzbekistan households, and will reduce 1.1 million tons of carbon dioxide emissions each year, helping Uzbekistan achieve by 2030. The goal of increasing the proportion of green electricity to 25% annually. Keywords: One Belt One Road, One Belt One Road Project

Since Goldwind entered the market through the first 750kW wind power project in Uzbekistan in 2012, under the guidance of the "Belt and Road" initiative, Goldwind has given full play to its product and technological advantages, improved service quality, actively developed and worked hard.

The successful signing of the contract has contributed to the promotion of foreign new energy cooperation, accumulated valuable experience for China's wind power to go global, and will help create a new situation of win-win cooperation among countries along the "Belt and Road". In the future, Goldwind will continue to adhere to the mission of "dedicated to human beings with clear water and blue sky, and leave more resources for the future", sincerely cooperate with partners, constantly open up new fields of cooperation, expand new space for cooperation, and jointly build a sustainable and better future. s future.Editor /Zhao E

Comment

Related articles

Construction Frontline

China Enterprises Undertake Air Traffic Management Cooperation Project

04-17

Construction Frontline

Some sections of the China Pakistan Railway project have started construction

04-16

Construction Frontline

Continue to show the charm of the the Belt and Road China Laos Railway

04-15

Construction Frontline

Zhongshui wins the design and construction project of Davao Public Transport

04-11

Construction Frontline

One Network, One Road, One Port Project Leading the Middle East

04-10

Construction Frontline

Nepal Electricity Authority's Expansion Project for Power Infrastructure to AIIB

04-10

Collect
Comment
Share

Retrieve password

Get verification code
Sure