Central enterprises
The project of Changsha-Anhua section of Changji Expressway won the bid
Seetao 2022-09-21 08:54
  • The main line of the project is about 125 kilometers long, with a design speed of 120 kilometers per hour
  • The project is divided into 4 bidding sections, with a total investment of about 26.42 billion yuan
Reading this article requires
5 Minute

On September 19, 2022, the Changsha Public Resource Trading Electronic Service Platform released the announcement of the successful bidders for the survey and design of the Changsha-Anhua section of the Changji Expressway. The project is divided into four sections for construction, with a total investment of about 26.42 billion yuan. .

Project Overview

The construction site of the project is located in Changsha City and Yiyang City, Hunan Province.

Project construction scale and bidding scope: The project starts from the west outer ring of Changsha Ring Expressway and ends in Anhua. The main control points along the line are /; , roadbed width/m, road width/m, and the design load of bridge and culvert is road/(I or II) grade. The survey and design of the subgrade, pavement, bridge, culvert, tunnel, intersection, traffic safety facilities, housing construction, and electromechanical engineering of the Changsha-Anhua section of the Changji Expressway are now open for tender.

The main line of the project is about 125 kilometers long, including about 103 kilometers in Changsha, about 23 kilometers in Xiangjiang New Area, about 80 kilometers in Ningxiang, and about 22 kilometers in Anhua. The total investment is about 26.42 billion yuan. The section from the starting point to the Hengshi hub is planned to adopt the technical standard for expressways with a design speed of 120 km/h, and the section from the Hengshi hub to the end is proposed to adopt the technical standard for the expressway with a design speed of 100 km/h. Key words: engineering construction information, engineering news, engineering construction

Bidding Information

Bid 01 was led by Hunan Provincial Transportation Planning, Survey and Design Institute Co., Ltd., and a consortium composed of Hunan Provincial Transportation Science Research Institute Co., Ltd. won the bid, with a bid price of 3.7727 million yuan; 02 Bid section was won by CCCC First Highway Survey and Design Research Institute Co., Ltd. , the bid price was 25.336 million yuan; the 03 bid was won by CCCC Second Highway Survey and Design Research Institute Co., Ltd. with a bid price of 24.008 million yuan; the 04 bid was won by Beijing Jiaoke Highway Survey and Design Co., Ltd., with a bid price of 19.6878 million Yuan. Congratulations to the winning bidder!Editor/Zhao E

Comment

Related articles

Central enterprises

Senior Meeting of China Communications Group with the President of Nauru

03-28

Central enterprises

WEC and Hong Kong Zhonghua Gas have reached strategic cooperation

03-28

Central enterprises

Accelerate the "three reform linkage" of thermal power its in the central region

03-26

Central enterprises

CCES holds an important meeting with the Prime Minister of Dominica

03-26

Central enterprises

CREC holds talks with the Ministry of Transport of Kazakhstan

03-26

Central enterprises

Senior Meeting between China Huaneng Group and Total Energy

03-25

Collect
Comment
Share

Retrieve password

Get verification code
Sure