Product
Guangxi large megawatt smart wind turbine goes offline
Seetao 2022-09-26 11:05
  • Qinzhou Offshore Wind Power Equipment Industrial Park was put into operation and large megawatt smart wind turbines went offline
Reading this article requires
4 Minute

On September 23, 2022, Guangxi Qinzhou Offshore Wind Power Equipment Industrial Park was put into operation and the first large-megawatt smart wind turbine was rolled off the assembly line. The large-megawatt smart wind turbines produced by the Envision Qinzhou Smart Energy Industrial Base will be shipped to all parts of Guangxi one after another.

The Qinzhou Offshore Wind Power Equipment Industrial Park gathers together the Envision Qinzhou Smart Energy Industry Base, the Jinfeng Marine Heavy Industry's 300,000-ton-per-year marine heavy equipment project, and the CSSC Guangxi Offshore Wind Power Industry Base and other major projects at the Guangxi Zhuang Autonomous Region level. It is a key project of the 100 million-level offshore wind power industry cluster.

Envision Qinzhou Smart Energy Industry Base has a total investment of about 5 billion yuan, covers an area of about 350 acres, and is constructed in three phases. The first phase of the Envision intelligent fan equipment manufacturing base, which has been put into production this time, has a planned land area of 50 acres, and has the ability to produce a full range of marine and land intelligent fans in the vision, with an annual production capacity of 500 sets.

The second and third phases of the project will be completed in the next two years and will become the first fan blade manufacturing base in Guangxi after it is put into operation. The third-phase test center will adopt the most advanced blade test system in the world, and introduce the advanced building block test and verification technology in the aerospace field into the wind power field, which can meet the test requirements of a single blade of 150-200 meters.Editor/Ma Xue

Comment

Related articles

Product

Delivery of 1200 ton wind power installation platform for Chinese ships

07-27

Product

Yancheng Canadian Solar energy storage products enter the market

06-29

Product

China's first large cruise ship Aida Modu officially out of dock

06-07

Product

Zoomlion " Jinpeng " سلسلة 23mpa سيارة مضخة الوزن

06-02

Product

1200 standard square alkaline water hydrogen production electrolyzer offline

05-26

Product

Birth of the first domestically produced 150 MW-class large-scale impact runner

05-16

Collect
Comment
Share

Retrieve password

Get verification code
Sure