Construction
The main cable of Guangdong Lingdingyang Bridge has been erected
Seetao 2022-09-27 15:14
  • The Lingdingyang Bridge of Shenzhen-Zhongshan Channel is currently the world's largest span steel box girder suspension bridge
Reading this article requires
4 Minute

Recently, the construction of the main cable strands of the Lingdingyang Bridge of the Shenzhen-Zhongshan Channel has been completed, and the bridge construction has made a breakthrough.

There are two main cables on the left and right sides of Lingdingyang Bridge, and a single main cable consists of 199 cable strands. Each cable strand is composed of 127-wire, 6 mm diameter 2060 MPa high-strength durable steel wire, and a single cable strand can bear the ultimate tensile force of up to 740 tons.

"We used the 2060 MPa main cable steel wire independently developed and manufactured, which is currently used in bridge construction and has the highest strength grade of main cable steel wire in China." Chen Huanyong, chief engineer of the Shenzhen-Zhongshan Channel Management Center, introduced, "At the same time, we Combined with the marine environment where the Lingdingyang Bridge is located, a new alloy-coated steel wire has been developed, which greatly improves the corrosion resistance and durability of the main cable."

The main cable steel wire with higher strength and stronger durability not only enhances the reliability and durability of the bridge, but also is of great significance for improving the span of China's long bridges, the main cable steel wire and cable manufacturing technology level, and will continue to consolidate my country's bridge technology. international advanced status.Editor/Ma Xue

Comment

Related articles

Construction

Hebei TV praises Shantui's intelligent construction products

05-08

Construction

The track laying of the Xiangyang-Jingzhou High-speed Railway has started!

03-18

Construction

Shuangyashan Green Aviation Fuel Base officially launched

10-16

Construction

The autumn centralized construction of China's first heavy-duty Daqin Railway

10-08

Construction

The reconstruction project of the main trunk canal in Heihexi, Gansu Province was started

09-30

Construction

Jingzhou Libu Yangtze River Railway Bridge enters the main tower construction stage

09-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure