Macro
Qingmengjin clear scenery of large base construction planning
Seetao 2022-09-28 09:17
  • During the 14th Five-Year Plan period, wind and solar power generation doubled
  • During the 14th Five-Year Plan period, renewable energy accounted for more than 50 percent of the increase in primary energy consumption
Reading this article requires
4 Minute

Under the background of accelerating the implementation of the dual carbon target, the development of renewable energy industry in various regions is thriving. Recently, the National Energy Administration called the national renewable energy development and construction situation analysis video meeting. The meeting mentioned that further promote the completion of large wind power photovoltaic base connected to the grid.

The era of large-scale scenery base has arrived, and all regions have clearly supported it in the "14th Five-Year" energy development plan. According to the international energy grid photovoltaic headlines (PV - 2005)/incomplete statistics, at present already in anhui, Beijing, fujian, gansu, guangdong, guangxi, guizhou, hubei, hunan, jiangsu, liaoning, jilin, Inner Mongolia, ningxia, qinghai, shandong, shanxi, tianjin, zhejiang specifically scenery 19 provinces/cities for the construction of large target and related planning.

Among them, Qinghai, Inner Mongolia and Shanxi provinces put forward specific projects for the construction of scenic large bases, with a total scale of 128.58GW. A total of 14 large-scale landscape bases are planned in Qinghai Province, with an additional scale of 38.58GW and a cumulative scale of 62.25GW. Inner Mongolia planning a total of 12 large scenery base, has a clear scale of 52GW; Shanxi plans a total of 5 large scenery base, has a clear scale of 38GW. Editor/Xu Shengpeng

Comment

Related articles

Macro

Digital twin empowers China's water conservancy system

09-16

Macro

Growth of China's fixed assets investment slowed from January to August

09-16

Macro

From January to August 2025, the fixed assets investment will be 504.1 billion yuan

09-16

Macro

Two departments collaborate to layout the integration of "artificial intelligence+energy"

09-15

Macro

The plan for steady growth in the power equipment industry has been introduced

09-15

Macro

The action plan for the large-scale construction of new energy storage has been announced

09-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure