[Anhui: Installed solar power capacity was 19.59GW at the end of August] By the end of August, the installed power generation capacity of Anhui Province was 87.6764 gigawatts, an increase of 5.884 gigawatts or 7.19 percent over the same period last year. By type, the installed capacity of hydropower, thermal power, wind power and solar power were 531.56, 5734.66, 542.38 and 19,590,500 kW respectively, 25.32, 18.63, 77.54 and 4,669,100 kW more than the same period of the previous year, with an increase of 5%, 0.33%, 16.68% and 31.29%. Editor/Xu Shengpeng
Click to see more live >>
Latest
  • 2024.04.23 17:19
  • [Xingan League wind power green methanol project started]
  • On April 18, Goldwind Technology Xingan League wind power coupling production 500,000 tons of green methanol project groundbreaking ceremony was held in Xingan League, Mongolia, marking the world's largest wind power hydrogen production green methanol new energy chemical project officially entered the construction stage. The project covers a total area of over 1,800 mu, with an annual output of 500,000 tons of green methanol after it is fully completed and put into operation, and will become a modern green methanol manufacturing base with leading technology, complete equipment and significant benefits. Su He, deputy secretary of Xingan League Committee, said that Xingan League insists on driving the development of new industries with new energy, and the 500,000-ton green methanol project of Goldwind Technology is a landmark project for Xingan League to build a green hydrogen production base of ammonia and green methanol in eastern Mongolia. We will use this project to accelerate the advancement of major projects of the League and inject strong impetus into the high-quality economic and social development of Hinggan League. It is hoped that Goldwind Technology and the majority of leading enterprises can continue to pay attention to Xing 'an, invest in Xing 'an, share development opportunities with us, and create a brilliant career. Editor/Xu Shengpeng
  • 2024.04.23 17:19
  • [China Harbor signed a contract with Angola Noqui Terminal project]
  • A few days ago, Baiyin Zhan, chairman of China Harbor, met with Ricardo Abreu, Minister of Transportation of Angola. The two sides conducted in-depth exchanges on strengthening cooperation in the field of infrastructure, and witnessed the signing of the Noqui River transport terminal project in Angola. The owner of the project is the Angolan Ministry of Communications, the main content is to dismantle the existing old terminal and build a new container yard, bulk cargo yard, maintenance area and management building, the project covers a total area of about 20,000 square meters, the project will further open up the north of Angola water transport line, to achieve the north of Angola sea transport and river transport interoperability. Editor/Xu Shengpeng
Share

Retrieve password

Get verification code
Sure