Central enterprises
Linxia Yongjing to Dahejia Jishishan highway project won the bid
Seetao 2022-10-06 16:33
  • The length of the project route is 74.811 kilometers, with 20168 meters /53 Bridges for the main line
  • The estimated total investment amount of the project is 15.34 billion yuan
Reading this article requires
6 Minute

Recently, the Chinese government procurement website released the pre-qualification results of social capital of Linxia Hui Autonomous Prefecture Transportation Bureau Yongjing to Dahejia (Jishi Mountain) Highway PPP project. The project was won by Gansu Province Road Air Tourism Investment Group Co., LTD. The total investment amount of the project budget is 15.34 billion yuan.

Project overview

Construction CONTENT: The expressway project from Yongjing to Dahejia Jishishan starts from Dataizi Village, Sanxian Township, Yongjing County, connects with the proposed expressway from Yongjing to Jingping, and ends at Hulin hometown, Jishishan County, connecting with Linda Expressway under construction, with a route length of 74.811 kilometers. Simultaneously, 1.612 kilometers of Lianhua connection line and 7.962 kilometers of Lijiyuan connection line are constructed.

There are 20168 meters /53 Bridges for the main line, among which there are 4085.5 meters /3 extra large Bridges, 15,391.5 meters /39 Bridges, 637 meters /9 middle Bridges and 54 meters /2 small Bridges. Set up 13,300 meters /7 tunnels, including 8,479 meters /2 long tunnels, 2,032.5 meters /1 long tunnels, 2,788.5 meters /4 middle tunnels; Set up 8 interchange, including 2 hub interchange stereoscopic crossings, 6 general interchange stereoscopic crossings, 6 ramp toll stations and 1 highway management station; There are 1 service area, 1 parking area, 1 maintenance area, 2 tunnel management stations, 12 tunnel substation and 1 comprehensive traffic law enforcement room. The lotus connecting line is equipped with a large bridge of 1006 meters /1; There are 308.5 meters /2 Bridges in Lijiayuan connection line, including 288 meters /1 bridge and 20.5 meters /1 small bridge. Bingling Temple interconnecting line has 1002 meters /2 Bridges, including 654 meters /1 super bridge and 348 meters /1 bridge. Key words: engineering construction information, engineering construction, engineering news

The bidding information

The first candidate winning the bid of this project: Gansu province highway aviation tourism investment group co., LTD., led, water conservancy and hydropower fourth engineering co., LTD., China's anhui province highway bridge engineering co., LTD., CCCC fourth highway engineering co., LTD., sichuan highway bridge construction group co., LTD. Gansu Orient fire engineering co., LTD. Rong Cheng gansu construction engineering co., LTD, road and air travel industry co., LTD., gansu province, gansu province The consortium of Transportation Planning, Survey and Design Institute Co., LTD won the bid. Congratulations to the winning bidder! Editor/Zhao E

Comment

Related articles

Central enterprises

CSCEC signed a strategic cooperation agreement with Guangzhou City

04-26

Central enterprises

The first batch of equipment shipment for Huanghua Port Automation Project

04-26

Central enterprises

Chinese ship Wen Gang and French total energy shipping high-level meeting

04-25

Central enterprises

Gansu Jiantou and Weiyang District Government Cooperation Symposium

04-24

Central enterprises

Prime Minister of Pakistan Visits Saudi Arabia to Invest in Major Projects

04-22

Central enterprises

Assistance to the Bahamas National Stadium Maintenance and Renovation Project

04-19

Collect
Comment
Share

Retrieve password

Get verification code
Sure