On October 18, 2022, the office of the people's government of zhoushan city public about city first session of the eighth National People's Congress (NPC) for the reply that no. 1 bill, including: according to the local resources and the current technical conditions, in accordance with the "appropriate electricity, electricity, appropriate hydrogen hydrogen" the principle of overall planning the whole domain forms of energy supply, and orderly development of energy projects. The comprehensive utilization of clean energy in Zhoushan is initially planned for the near term (2021-2025), medium term (2026-2030) and long term (2031-2035), with a total of 14.5 million kW of wind energy and photovoltaic power planned for the near and medium term. Through the rational distribution of clean energy in batches, the overall pattern of "11211" is finally formed. Focus on building high-tech zone and Daishan County, two renewable energy high-end equipment manufacturing industrial park, Daishan County mainly relies on the north of Xiushan Huisheng block fan manufacturing and other core manufacturing base and far-reaching sea breeze electric transport ground.
Industrial alliance and supporting implementation. With resource development as the fulcrum, we will strive to leverage the construction of the whole industrial chain of clean energy such as solar, wind and hydrogen energy, and make it clear that resource support must match the proportion of investment in manufacturing projects. At present, Zhoushan City has introduced a batch of clean energy equipment manufacturing projects.
We will actively explore and innovate low-carbon development experience, and form experiences and paths that can be copied and promoted. In 2021, Putuo District was included in the first batch of provincial-level low-carbon counties (districts) pilot list. Focusing on building a "clean energy conversion hub", China will vigorously develop renewable energy sources such as wind power, photovoltaic power and tidal current power, accelerate the construction of LNG landing centers, actively carry out hydrogen energy application demonstration, and jointly promote low-carbon development in energy, construction, transportation, agriculture and forestry, and residential life. We plan to build a "Putuo model" of low-carbon energy development in the province in 3-5 years. Editor/Xu Shengpeng
Comment
Write something~