Transportation
Shenhai Expressway Huocun to Longshan section reconstruction project approved
Seetao 2022-10-24 17:15
  • At present, the standard before Shen-Hai expressway can not meet the needs of economic development in coastal areas
  • The total length of the project is about 39.38 kilometers, with a total of 17,201 meters /58 Bridges
Reading this article requires
5 Minute

Recently, the Guangdong Provincial Development and Reform Commission issued a reply to the approval of the Shenyang - Haikou National Highway Huocun - Longshan extension project.

Shenhai high-speed reconstruction and expansion project

The Shen Hai high-speed fire village to the longshan period of reconstruction project along the original route, reconstruction and expansion route from village interchange with the fire of guangshen highway intersection, the docking of the pearl river in guangzhou huangpu bridge, to the northwest after her hillock, changping, eight dou turned to the west, after taihe, and and high jiang town, finally and wide highway intersection of longshan interchange, and west on the highway, The total length of the route is about 39.38 kilometers.

It is reported that the Shenhai Expressway Huocun to Longshan section of the reconstruction and expansion project adopts the technical standards of the expressway, in which the old road Muqiang tunnel to Tianluyuan tunnel K2996+202-K2998+817 fully uses the existing tunnel to maintain the design speed of 80 km/h, the rest of the road adopts the design speed of 100 km/h. The starting point from Huocun Interchange to Badou interchange is 12 lanes in both directions, and the width of the new separated roadbed is 2×16.75 meters on both sides of the existing highway. From Bidou Interchange to Longshan Interchange, 10 lanes are used in both directions with a roadbed width of 50 meters. The vehicle load grade for the whole line of bridge and culvert design shall be highway-I, and other technical indicators shall comply with the relevant provisions of "Highway Engineering and Technical Standards". The total investment is estimated to be 15.771 billion yuan.

The project has set up a total of 17201 meters /58 Bridges, including 8178 meters /3 extra large Bridges, 7875 meters /16 Bridges, 750 meters /2 short tunnels; There are 12 interchanges, including 11 overpasses in Huocun Junction, Xiangxue Junction, Luogang Junction, Changping Junction, Badou Junction, Taihe Junction, Shihu Junction, Beicun Junction, Benhu Junction, Shuili Junction and Longshan Junction, and 1 new overpass in Maofeng Mountain; Set one service area and one management center. We will also build necessary traffic works and facilities along the routes. Editor/He Yuting

Comment

Related articles

Transportation

Etihad Railway's $6.5 billion high-speed rail project connects Abu Dhabi and Dubai

02-06

Transportation

The construction of high-speed rail plays the "song of progress"

02-05

Transportation

Uruguay launches railway national master plan and infrastructure improvement plan

02-02

Transportation

Spain and Catalonia governments join hands to upgrade Rodales rail transit network

02-02

Transportation

Investment of 6.93 billion yuan, Rizhao Linyi Expressway is about to be connected

02-02

Transportation

China Railway Fifth Bureau won the bid for the expressway worth billions of yuan

02-02

Collect
Comment
Share

Retrieve password

Get verification code
Sure