Transportation
Shanxi Road and Bridge Co., Ltd. won the bid for 3 expressway projects
Seetao 2022-11-10 08:56
  • The total construction mileage of the main line of Bailin Expressway is 44.21km, and the design speed is 80km/h
  • The total construction mileage of the main line of Songchang Expressway is 113.26 km, and the design speed is 80 km/h
Reading this article requires
5 Minute

On November 8, 2022, the Chinese government procurement network released the results of the pre qualification of the selection of social capital for PPP projects of Bailin, Songchang and West Ring Expressway in Changchun Metropolitan Circle. Six companies, including China Railway Construction Chongqing Investment Group and Shanxi Road and Bridge Construction Group, won the bid in advance, with a total investment of 31.71 billion yuan.

Project overview

Bailin Expressway: starts from the north of Changgang Village, Hekou Street, Hunjiang District, Baishan City, and ends at the west of Group 7, Taixing Village, Jianguo Street, Linjiang City.

Songchang Expressway: starts from the southeast of Songjianghe Town, Fusong County, and ends at the north of Liangjiang Village, Changbai County.

West Ring Expressway of Changchun Metropolitan Circle: it starts from the long expressway near Zhangjia, Beisimen, Yitong County, and finally connects to the Nong'an Jiutai section of Changchun Metropolitan Circle Expressway near Chijiadian, Nong'an County.

Construction scale and standard

Bailin Expressway: the total mileage of the main line is 44.21km, the four lane expressway standard with a design speed of 80km/h is adopted, and the subgrade width is 25.5m.

Songchang Expressway: the total construction mileage of the main line is 113.26 km, the four lane expressway standard with a design speed of 80 km/h is adopted, and the subgrade width is 25.5 m.

West Ring Expressway in Changchun Metropolitan Area: the total mileage of the main line is 143.71km, the four lane expressway standard with a design speed of 120km/h is adopted, and the subgrade width is 27.0m. Keywords: engineering news, engineering construction, engineering construction information

查看源图像

Project cooperation period: the cooperation period of this project is 44 years, including the construction period of 4 years and the operation period of 40 years

Pre bid winning results

Applicants passing the prequalification: Shanxi Road and Bridge Construction Group Co., Ltd., Anhui Road and Bridge Engineering Co., Ltd., Longjian Road and Bridge Co., Ltd., China Railway Corporation, Zhejiang Traffic Engineering Group Co., Ltd., and China Railway Construction Chongqing Investment Group Co., Ltd. Editor/Zhao E

Comment

Related articles

Transportation

China signs 28 infrastructure cooperation projects with multiple African countries

06-13

Transportation

The first single track railway in Bangladesh has been signed and landed in Chittagong

06-10

Transportation

Modi unveils world's tallest single arch railway bridge, Kashmir railway connects

06-10

Transportation

9000 tons! For the first time in the world! The trial was successful

06-09

Transportation

The first high pier of the Sichuan-Chongqing section of China's high-speed rail started!

06-05

Transportation

China Construction will undertake the construction of Kyrgyzstan International Airport

05-29

Collect
Comment
Share

Retrieve password

Get verification code
Sure