Mine
Bid opening for geotechnical survey of Shaanxi molybdenum mine
Seetao 2022-11-10 15:05
  • The project plans to upgrade the old concentrator and build a 30000 ton/day concentrator
  • After the completion of the project, the organic connection of mining and beneficiation will be realized, and the subsequent development and construction of Jinduicheng Molybdenum Mine will be more orderly and reasonable
Reading this article requires
3 Minute

Recently, China Nonferrous Metals Industry Xi'an Survey, Design and Research Institute Co., Ltd. won the bid for geotechnical engineering survey of Jinduicheng Molybdenum Mine's overall beneficiation upgrading and transformation project.

The project is located in Jindui Town, Huazhou District, Weinan City, Shaanxi Province. With the reform of mineral processing technology, the mineral processing technology of each concentrator in Jinduicheng is backward, the equipment is obsolete, the equipment level is backward, the automation is difficult to achieve, the maintenance workload is large, the operation energy consumption is high, the service life of some buildings is long, and there are potential safety hazards. The project plans to upgrade the old concentrator and build a new 30,000 ton/day concentrator. The survey technology company undertakes the task of the project.

After the completion of the project, it will realize the organic connection of mining and beneficiation, reduce the overall beneficiation cost, improve the production efficiency, reduce energy consumption, reduce emissions, and finally achieve large-scale, efficient equipment, refined and intelligent management, so as to ensure a more orderly, rational and sustainable and efficient development of the follow-up development and construction of Jinduicheng Molybdenum Mine. Editor/Zhao E


Comment

Related articles

Mine

CREC won the bid for projects in the Democratic Republic of Congo and Serbia

01-05

Mine

Signing of the Silicon Resource Industry Base Project in Luodian County, Guizhou

11-21

Mine

1.5 million tons/year mining and beneficiation project started

10-26

Mine

Leo Lithium signed an equity investment agreement with China Ganfeng

09-15

Mine

Shanxi Dongfeng Coal Mine Production Capacity Increase Approval

09-14

Mine

Inner Mongolia Abandoned Mine Ecological Restoration Project Commences

09-12

Collect
Comment
Share

Retrieve password

Get verification code
Sure