Transportation
The preliminary design of Yunnan Yuwei high speed has been approved
Seetao 2022-11-14 08:59
  • There are 8 interchanges on the whole line, and 6 interconnecting lines 22.806 kilometers are built synchronously
  • The total length of the route is 115.369 km, including 105.37 km in Yulong County of Lijiang City and 9.999 km in Visi County of Deqen Prefecture
Reading this article requires
5 Minute

We have received the documents concerning the Approval of the Preliminary Design of Yulong (Xionggu) to Weixi Expressway from Diqing Tibetan Autonomous Prefecture Transport Bureau of Lijiang City and the Preliminary Design of Yulong (Xionggu) to Weixi Expressway at Two Stages. The construction scale, technical standards and estimated investment determined in accordance with the Reply to the Feasibility Study Report of Yulong (Xionggu) to Weixi Expressway Project of Yunnan Development and Reform Commission are hereby approved after examination.

Construction scale and technical standards

Yulong (Xionggu) to Weixi Expressway starts from Baihanchang, Jiuhe Town, Yulong County, Lijiang City. Baihanchang Junction Interchange will connect with Xiangli Expressway and end at Yongchun Town, Weixi County, Deqen City. It will connect with the proposed Weixi to Yezhi Expressway, with a total length of 115.369 km (including 105.37 km in Yulong County, Lijiang City and 9.999 km in Weixi County, Deqen City).

There are 8 interchanges: Baihanchang (Hub), Shitou, Shigu, Sixing, Jinjiang, Liming, Judian and Ludian.

Synchronous construction of 6 interconnecting lines 22.806 kilometers. Among them, 4.842 kilometers of Seok, 3.198 kilometers of Siheung, 3.325 kilometers of Jinjiang, 4.9 kilometers of Liming, 2.786 kilometers of Judian, and 3.755 kilometers of Ludian.

The main line adopts the standard construction of two-way four-lane expressway, the design speed is 80 km/h, the width of the roadbed is 25.5 meters, and the design vehicle load grade of the bridge and culvert is highway-ⅰ class. Other technical specifications shall be implemented in accordance with Highway Engineering Technical Standards (JTG B01-2014). Key words: infrastructure, infrastructure construction, domestic engineering news, planning investment

Shitou and Sixing interconnecting line adopts the three-level highway standard construction, the design speed is 30 km/h, the width of the roadbed is 8.5 meters; The Jinjiang, Liming, Judian and Ludian interconnecting lines are constructed by the standard of secondary highways, with a design speed of 40km/h and a width of 10m roadbed. Editor/Xu Shengpeng


Comment

Related articles

Transportation

The Suizhou Jingmen Expressway is planned to start construction in December 2026

06-03

Transportation

The traffic in the revolutionary old areas of Gansu has undergone a transformation

06-03

Transportation

China and Kazakhstan will cancel transportation quotas by the end of 2026

05-31

Transportation

The first intercity railway R1 line in Quanzhou is under full construction

05-28

Transportation

The main project of the Pinglu Canal waterway has been fully connected

05-28

Transportation

Chongqing Wanzhou High speed Railway Shituo Yangtze River Bridge Main Bridge Closure

05-28

Collect
Comment
Share

Retrieve password

Get verification code
Sure