On November 24, 2022, Zhaoqing Public Resources Trading Center released the bid winning results of the EPC project of the Pearl River Delta Terminal Airport Section of the new Guangzhou Zhanjiang high-speed railway. The project was awarded by the China Railway Design Group Consortium. The construction period of the project is five years, and the investment is estimated to be 99.8 billion yuan.
Project overview
Construction scale: The newly-built Guangzhou Zhanjiang High speed Railway starts from Guangzhou Station, passes through Foshan, Zhaoqing, Yunfu, Yangjiang, Maoming and Zhanjiang in the west, and ends at Zhanjiang North Station, with a new double line of 400.1 km. Foshan, Shinkansen Airport Station, Xinxing South Station, Yangchun East Station, Yangjiang North Station, Mata Station, Maoming South Station, Wuchuan Station and Zhanjiang North Station are newly established, and Zhanjiang East Station and Yangxi Station are reserved. Guangzhou hub new connecting line and other projects. New Zhanjiang North EMU Station.
Project scope: Zhujiang Delta Terminal Airport Section of Guangzhou Zhanjiang High speed Railway (DK50+328.089 ~ DK129+300): including the architectural decoration and electromechanical engineering of Zhujiang Delta Airport Station, Xinxing South Railway Station and related projects. The scope of Huilong Railway Station only includes the track laying project and the "four electricity" project. The scope of portal piers of Guangzhou Zhanjiang High speed Railway before and after Huilong Railway Station only includes the track laying project, the "four electricity" project, the beam and above projects;
Simultaneous implementation of Zhujiang Zhaoming High speed Railway and South Shenzhen High speed Railway: only including the projects within the Pearl River Delta Airport Station and throat section within the red line of the Pearl River Delta hub airport, the earthwork works, slope protection works and foundation treatment works in the north-south section; The simultaneous implementation of Zhaoshun South Intercity and Rail Transit and the Pearl River Delta Hub Airport. Keywords: engineering news, engineering construction information, engineering construction
Bid winning information
The first candidate for winning the bid of this project: China Railway Design Group Co., Ltd., CCCC First Highway Engineering Group Co., Ltd. and China Railway 12th Bureau Group Co., Ltd., with a bid price of 20.89 billion yuan. Editor/Zhao E
Comment
Write something~