Hydropower
Guangxi Hezhou Pumped Storage Power Station Survey Service Signing
Seetao 2022-11-29 08:56
  • Guangxi Hezhou Pumped Storage Power Station, with an installed capacity of 1200 MW, is a Class I large (1) project
  • The completion of the project will ensure the safe and stable economic operation of Guidong power system and make contributions to the construction of a new power system with new energy as the main body in Guangxi
Reading this article requires
5 Minute

Recently, China Energy Engineering Guangxi Institute, as the leading unit, formed a consortium with Guangxi Zhuang Autonomous Region Water Conservancy and Electric Power Survey, Design and Research Institute Co., Ltd. to sign a survey and design contract for the pre feasibility study, feasibility study, bidding design and construction drawing design stages of Guangzhou Hezhou Pumped Storage Power Station with Guangxi Guidong Electric Power Co., Ltd.

Hezhou Pumped Storage Power Station is located in Babu District, Hezhou City, with an installed capacity of 1200 MW. It is a Class I large (1) project. The main buildings include upper and lower reservoir water retaining structures and flood releasing structures, water conveyance and power generation system buildings, underground powerhouse cavern group system, ground switch station, etc. After the completion of the project, it will ensure the safe and stable economic operation of the power system in Guidong, promote the large-scale and high proportion development and utilization of new energy in Guidong, and make contributions to the construction of a new power system with new energy as the main body in Guangxi.

The successful signing of the project is another good achievement of China Energy Engineering Guangxi Institute after signing the full stage survey and design contracts for several pumped storage power stations inside and outside Guangxi. Guangxi Institute will fully and firmly implement the Several Opinions and the "1466" strategy of China Energy Engineering Corporation, focus on value creation, adhere to the five major orientations, play the five major roles, dare to cultivate opportunities, open new situations, and be the first to seize the pumped storage market opportunities under the dual carbon target, continue to grow, strengthen, and optimize the pumped storage business, comprehensively broaden the new path of enterprise development and leap forward, and strive to become a benchmark for differentiated development, Contribute to the reconstruction of a high-quality development and new energy construction. Editor/Zhao E


Comment

Related articles

Hydropower

POWERCHINA Renews Operation and Maintenance Contract for Jibulo Hydropower Station

12-05

Hydropower

Ha Electric Group wins order for Cambodia's Shangdadai Pumped Storage Power Station

11-14

Hydropower

China's Three Gorges aid construction of Uganda's Isimba hydropower station

11-07

Hydropower

Jiangxi Ganxian Pumped Storage Power Station Project officially starts construction

11-03

Hydropower

The main project Qinghai pumped storage power station has officially started construction

11-03

Hydropower

The main project of Shanyang Pumped Storage Power Station has started construction

11-03

Collect
Comment
Share

Retrieve password

Get verification code
Sure